Data center campus
AirTrunk JHB1 Johor Bahru Data Centre
AirTrunk JHB1 Johor Bahru Data Centre is an AI data center campus developed by AirTrunk in Johor, Johor Bahru. 0.15 GW of capacity has been announced; 0.05 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Partially energized · AirTrunk · Private land · other · Johor Bahru, Johor, Malaysia
Capacity: announced vs energized
Announced-to-energized gap: 0.10 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.15 GW | 2024-06-01 | claimed | press release |
| Energized | 0.05 GW | 2024-07-01 | reported | journalist report |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Grid
Land
Announced-to-energized gap
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- 150 MW campus open / 50 MW+ initial (primary)
- On July 30, 2024, AirTrunk announced official opening and commencement of operations at AirTrunk JHB1, its flagship Malaysian 150 MW hyperscale data centre in Johor Bahru. The company said initial phases would provide over 50 MW of capacity for large technology customers, on a site spanning over 10.3 hectares (AirTrunk, July 30 2024)
- Direct-to-chip liquid cooling / PUE 1.15 (primary)
- AirTrunk describes JHB1 as AI-ready with its first deployment of direct-to-chip liquid cooling alongside traditional indirect evaporative cooling (IEC) and high-density racks, and cites a design Power Usage Effectiveness (PUE) of 1.15. The company said the liquid cooling approach launched in July 2024 after five years of R&D and is claimed to reduce energy consumption by up to 23 percent (AirTrunk, July 30 2024)
- 30 MW renewable VPPA / onsite solar (primary)
- AirTrunk says it announced the first renewable energy Virtual Power Purchase Agreement for a data centre for 30 MW of renewable energy with developer ib vogt under Malaysia's Corporate Green Power Programme (stated as the maximum allocation available for an individual developer with a secured offtaker). JHB1 is also described as solar-ready roof capable of providing over 1 MW for that phase (AirTrunk, July 30 2024)
- TNB grid connection / Singapore AZ framing (primary)
- AirTrunk states it worked with Tenaga Nasional Berhad (TNB) to connect JHB1, following a 2023 MOU to advance the energy transition, and frames the Johor Bahru site as servicing a major cloud availability zone with strong domestic and international connectivity including neighbouring Singapore via an end-to-end cross-border connection strategy (AirTrunk, July 30 2024)
- Jan 2023 entry / sustainability-linked loan (primary)
- On Jan 19, 2023, AirTrunk announced entry into Malaysia with JHB1 as a 150+ MW campus on 10.3 hectares in Johor Bahru, funded under its sustainability-linked loan framework and anchored by one of the world's largest technology companies (unnamed). The release said initial phases would provide 50 MW with construction due for completion in 2024, and described a solar-ready roof equipped to add 5 MW of panels alongside design PUE of 1.15 (AirTrunk, Jan 19 2023)
- Pekat Solar 1 MW rooftop (primary)
- On Nov 20, 2024, AirTrunk announced an agreement with Pekat Solar to develop rooftop solar at JHB1 delivering 1 MW of onsite renewable generation, framed as AirTrunk's first onsite renewable generation initiative in the region and additive to the 30 MW ib vogt renewable VPPA under Malaysia's Corporate Green Power Programme (AirTrunk, Nov 20 2024)
- Opening ceremony / 4M safe work hours (primary)
- AirTrunk's July 30, 2024 opening release says the JHB1 development was completed in over 4 million work hours with no major safety incidents, and lists opening attendees including Malaysia's Deputy Minister for MITI YB Tuan Liew Chin Tong, Johor State Investment Committee Chairman YB Tuan Lee Ting Han, and Australia's High Commissioner to Malaysia Danielle Heinecke, alongside MDEC, MIDA, Invest Johor, IRDA, and TNB representatives (AirTrunk, July 30 2024)
On the data center map
Every tracked data center is on this map, centered on AirTrunk JHB1 Johor Bahru Data Centre. Pan or zoom out to see how close rivals are building.
- Cooling
- Direct-to-chip liquid cooling with indirect evaporative cooling; PUE 1.15
- Tenant
- Unnamed anchor hyperscale technology customer
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterJohor(10)
The deal
- operator
- AirTrunk
- developer
- AirTrunk · Developer and operator
- tenant
- Unnamed anchor hyperscale technology customer · Anchored by 'one of the world's largest technology companies' (not named)
- developer
- AirTrunk
Power
- Power source
- grid
- Grid operator
- other
- Interconnection
JHB1 renewable virtual PPA (Corporate Green Power Programme), 0.03 GW solar, Energized. 30MW secured via virtual PPA under Malaysia's Corporate Green Power Programme; plus over 1MW onsite solar
Why here
AirTrunk JHB1 Johor Bahru Data Centre sits on private land in Johor, Johor Bahru. It connects to the other grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Investment, workforce and specs
- Cooling
- Direct-to-chip liquid cooling with indirect evaporative cooling; PUE 1.15 source
Timeline
- Aug 2026party addedtenant: Unnamed anchor hyperscale technology customer
- Oct 2026Current: Partially energized
Sources
- AirTrunk opens AI-ready data centre in Malaysia - AirTrunk
- AirTrunk Opens 150MW Hyperscale Data Center in Johor Bahru - w.media
- AirTrunk enters Malaysia with new 150+MW hyperscale data centre in Johor Bahru
- AirTrunk and Pekat Solar to develop rooftop solar at AirTrunk's Johor Bahru data centre, JHB1
39db4fd5-4ac9-48b0-bc19-fc031e5561a3 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is AirTrunk JHB1 Johor Bahru Data Centre?
How much power will AirTrunk JHB1 Johor Bahru Data Centre use?
Who is building AirTrunk JHB1 Johor Bahru Data Centre?
Is AirTrunk JHB1 Johor Bahru Data Centre operating yet?
How verified is the data on AirTrunk JHB1 Johor Bahru Data Centre?
Deploy Watch
Track AirTrunk JHB1 Johor Bahru Data Centre on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). AirTrunk JHB1 Johor Bahru Data Centre: AI data center campus record. Retrieved October 4, 2026, from https://registry.deploy.report/datacenters/airtrunk-jhb1-johor-bahru
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/airtrunk-jhb1-johor-bahru.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/airtrunk-jhb1-johor-bahru
- Data documentation: /data
- Query this programmatically: Deploy MCP