DEPLOYDatabase

Data center campus

AirTrunk TOK2

Under construction · AirTrunk · Tokyo, Japan


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
AirTrunk TOK2 capacity claims
Source

Key facts

0 GW

Energized

AirTrunk

Developer

Tokyo, Japan

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
under construction (Tokyo West)

On the data center map

Every tracked data center is on this map, centered on AirTrunk TOK2. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

developer
AirTrunk

Power

Power source
grid
Interconnection

Why here

AirTrunk TOK2 is in Tokyo, Japan. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

0305ed9e-0571-42ba-a458-4d02721b616d · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is AirTrunk TOK2?
AirTrunk TOK2 is an AI data center campus tracked on the DEPLOY registry, located in Tokyo, Japan. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building AirTrunk TOK2?
AirTrunk is recorded as a party to AirTrunk TOK2 on the DEPLOY registry. The full party list, with each role, is on the record.
Is AirTrunk TOK2 operating yet?
As of the most recent verification on the DEPLOY registry, AirTrunk TOK2 is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on AirTrunk TOK2?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track AirTrunk TOK2 on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). AirTrunk TOK2: AI data center campus record. Retrieved August 29, 2026, from https://registry.deploy.report/datacenters/airtrunk-tok2

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces