DEPLOYDatabase

Data center campus

BDx SUB1 Surabaya

BDx SUB1 Surabaya is a tracked AI data center campus in Surabaya.

Announced · BDx Data Centers · Surabaya


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
BDx SUB1 Surabaya capacity claims
Source

Key facts

announced

Lifecycle

0 GW

Energized

Surabaya

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
listed as coming soon on operator site

On the data center map

No mappable coordinate is recorded for BDx SUB1 Surabaya yet. Location: Surabaya.

The deal

Power

Power source
grid
Interconnection

Why here

BDx SUB1 Surabaya is in Surabaya. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

7c81c4a0-8ee5-4a55-a6d0-1a00870f24f9 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is BDx SUB1 Surabaya?
BDx SUB1 Surabaya is an AI data center campus tracked on the DEPLOY registry, located in Surabaya. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building BDx SUB1 Surabaya?
BDx Data Centers is recorded as a party to BDx SUB1 Surabaya on the DEPLOY registry. The full party list, with each role, is on the record.
Is BDx SUB1 Surabaya operating yet?
As of the most recent verification on the DEPLOY registry, BDx SUB1 Surabaya is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on BDx SUB1 Surabaya?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track BDx SUB1 Surabaya on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). BDx SUB1 Surabaya: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/bdx-data-centers-bdx-sub1-surabaya

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces