FIN-01

FIN-01 is a tracked AI data center campus in Helsinki, Finland. Powered by 50% hydroelectric and 50% wind per operator docs; PUE 1.2. MW capacity not publicly disclosed. Hosts H100/H200/B200/GB300 SKUs offered by the operator, not confirmed as site-specific.

Energized · Verda (formerly DataCrunch) · Helsinki, Finland


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
FIN-01 capacity claims
Source

Key facts

On the data center map

Every tracked data center is on this map, centered on FIN-01. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

Power

Power source
other
Interconnection

Why here

FIN-01 is in Helsinki, Finland. It draws on other power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

269b6044-fe31-4be1-b58e-24315715e60e · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is FIN-01?
FIN-01 is an AI data center campus tracked on the DEPLOY registry, located in Helsinki, Finland. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building FIN-01?
Verda (formerly DataCrunch) is recorded as a party to FIN-01 on the DEPLOY registry. The full party list, with each role, is on the record.
Is FIN-01 operating yet?
As of the most recent verification on the DEPLOY registry, FIN-01 is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on FIN-01?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track FIN-01 on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). FIN-01: AI data center campus record. Retrieved August 30, 2026, from https://registry.deploy.report/datacenters/datacrunch-fin-01

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces