Data center facility

Muskie Data Campus

TeraWulf · Boyd County. Every figure below is individually sourced and dated.


Facility record

planned

Status

crypto hpc

Type

TeraWulf

Operator

Boyd County

Location

1000 MW

Critical IT

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 1+ GW total campus (~285 acres); initial 500 MW phase (reported) · source
  • record: Muskie Data Campus (reported) · source
  • status: Zoned; permitting underway. Initial 500 MW targeted 2H 2028, additional 500 MW 2H 2030 (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: planned

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Muskie Data Campus?
Muskie Data Campus is a data center facility record on the DEPLOY registry, in Boyd County. Every fact on the record is individually sourced and dated.
Who operates Muskie Data Campus?
TeraWulf operates Muskie Data Campus, per the sourced record on the DEPLOY registry.
Is Muskie Data Campus operating?
Muskie Data Campus is recorded as planned on the DEPLOY registry, with 1000 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on Muskie Data Campus?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Muskie Data Campus on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Muskie Data Campus: data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/terawulf-muskie-eastpark-eastern-ky

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces