TeraWulf Cayuga (Lake Hawkeye)

TeraWulf · Lansing. Every figure below is individually sourced and dated.


Facility record

under construction

Status

crypto hpc

Type

TeraWulf

Operator

400 MW

Critical IT

2026

Operational

On the map

Placed at its city centroid. See it among every tracked data center on the national map.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 400 (reported) · source
  • record: TeraWulf Cayuga (Lake Hawkeye) (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: under construction

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is TeraWulf Cayuga (Lake Hawkeye)?
TeraWulf Cayuga (Lake Hawkeye) is a data center facility record on the DEPLOY registry, in Lansing. Every fact on the record is individually sourced and dated.
Who operates TeraWulf Cayuga (Lake Hawkeye)?
TeraWulf operates TeraWulf Cayuga (Lake Hawkeye), per the sourced record on the DEPLOY registry.
Is TeraWulf Cayuga (Lake Hawkeye) operating?
TeraWulf Cayuga (Lake Hawkeye) is recorded as under construction on the DEPLOY registry, with 400 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on TeraWulf Cayuga (Lake Hawkeye)?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track TeraWulf Cayuga (Lake Hawkeye) on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.