DEPLOYDatabase

Data center campus

Warsaw Datacenter (WAW)

Warsaw Datacenter is a tracked AI data center campus in Warsaw, Poland.

Energized · OVHcloud · Warsaw, Poland


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Warsaw Datacenter (WAW) capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

OVHcloud

Developer

On the data center map

No mappable coordinate is recorded for Warsaw Datacenter (WAW) yet. Location: Warsaw, Poland.

The deal

developer
OVHcloud

Sources

86f2fd9a-d3b2-4cf3-8234-f0adeefac7a1 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Warsaw Datacenter (WAW)?
Warsaw Datacenter (WAW) is an AI data center campus tracked on the DEPLOY registry, located in Warsaw, Poland. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Warsaw Datacenter (WAW)?
OVHcloud is recorded as a party to Warsaw Datacenter (WAW) on the DEPLOY registry. The full party list, with each role, is on the record.
Is Warsaw Datacenter (WAW) operating yet?
As of the most recent verification on the DEPLOY registry, Warsaw Datacenter (WAW) is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Warsaw Datacenter (WAW)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Warsaw Datacenter (WAW) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Warsaw Datacenter (WAW): AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/ovhcloud-warsaw-datacenter

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces