DEPLOYDatabase

Data center campus

Nxera Johor (Iskandar Puteri)

Nxera Johor is a tracked AI data center campus in Iskandar Puteri, Johor. MoU with Telekom Malaysia announced 2024 to jointly develop hyperscale AI-ready capacity in Johor. Still in early development.

Announced · Nxera · Iskandar Puteri, Johor, Malaysia


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Nxera Johor (Iskandar Puteri) capacity claims
Source

Key facts

announced

Lifecycle

0 GW

Energized

Nxera

Developer

Malaysia

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
200 MW (operator-announced planned total capacity across campus)

On the data center map

No mappable coordinate is recorded for Nxera Johor (Iskandar Puteri) yet. Location: Iskandar Puteri, Johor.

The deal

developer
Nxera

Power

Power source
grid
Interconnection

Why here

Nxera Johor is in Iskandar Puteri, Johor. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

723c69ca-f17a-40ff-b3bb-9ada22a0477a · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Nxera Johor (Iskandar Puteri)?
Nxera Johor (Iskandar Puteri) is an AI data center campus tracked on the DEPLOY registry, located in Iskandar Puteri, Johor. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Nxera Johor (Iskandar Puteri)?
Nxera is recorded as a party to Nxera Johor (Iskandar Puteri) on the DEPLOY registry. The full party list, with each role, is on the record.
Is Nxera Johor (Iskandar Puteri) operating yet?
As of the most recent verification on the DEPLOY registry, Nxera Johor (Iskandar Puteri) is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Nxera Johor (Iskandar Puteri)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Nxera Johor (Iskandar Puteri) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Nxera Johor (Iskandar Puteri): AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/singtel-nxera-nxera-johor

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces