DEPLOYDatabase

Data center campus

VIRTUS Stockley Park Campus (LONDON2/LONDON5/LONDON7/LONDON9/LONDON11)

VIRTUS Stockley Park Campus is a tracked AI data center campus in Stockley Park, London.

Energized · ST Telemedia Global Data Centres · Stockley Park, London, United Kingdom


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
VIRTUS Stockley Park Campus (LONDON2/LONDON5/LONDON7/LONDON9/LONDON11) capacity claims
Source

Key facts

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
anchor London campus; part of Virtus UK portfolio >300 MW across 17 sites

On the data center map

No mappable coordinate is recorded for VIRTUS Stockley Park Campus (LONDON2/LONDON5/LONDON7/LONDON9/LONDON11) yet. Location: Stockley Park, London.

The deal

Power

Power source
grid
Interconnection

Why here

VIRTUS Stockley Park Campus is in Stockley Park, London. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

UK Maritime Autonomous Surface Ships (MASS) Code Publicationstandard · 2026-07-01 · United Kingdom
UK Self-Driving Liability and Licensing Regimestandard · 2026-01-01 · United Kingdom

Sources

d311f466-aad6-49af-823e-de32253ffb8f · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is VIRTUS Stockley Park Campus (LONDON2/LONDON5/LONDON7/LONDON9/LONDON11)?
VIRTUS Stockley Park Campus (LONDON2/LONDON5/LONDON7/LONDON9/LONDON11) is an AI data center campus tracked on the DEPLOY registry, located in Stockley Park, London. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building VIRTUS Stockley Park Campus (LONDON2/LONDON5/LONDON7/LONDON9/LONDON11)?
ST Telemedia Global Data Centres is recorded as a party to VIRTUS Stockley Park Campus (LONDON2/LONDON5/LONDON7/LONDON9/LONDON11) on the DEPLOY registry. The full party list, with each role, is on the record.
Is VIRTUS Stockley Park Campus (LONDON2/LONDON5/LONDON7/LONDON9/LONDON11) operating yet?
As of the most recent verification on the DEPLOY registry, VIRTUS Stockley Park Campus (LONDON2/LONDON5/LONDON7/LONDON9/LONDON11) is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on VIRTUS Stockley Park Campus (LONDON2/LONDON5/LONDON7/LONDON9/LONDON11)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track VIRTUS Stockley Park Campus (LONDON2/LONDON5/LONDON7/LONDON9/LONDON11) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). VIRTUS Stockley Park Campus (LONDON2/LONDON5/LONDON7/LONDON9/LONDON11): AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/stt-gdc-virtus-stockley-park-campus-london2london5london7london9london11

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces