Vantage KUL1 Cyberjaya I

Vantage KUL1 Cyberjaya I is a tracked AI data center campus in Cyberjaya.

Partially energized · Vantage Data Centers APAC · 6-acre campus, 463,000 sq ft when fully developed · Cyberjaya, Malaysia


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Vantage KUL1 Cyberjaya I capacity claims
Source

Key facts

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
31 MW (31 MW critical IT load at full build across four buildings)

On the data center map

No mappable coordinate is recorded for Vantage KUL1 Cyberjaya I yet. Location: Cyberjaya.

The deal

Power

Power source
grid
Interconnection

Why here

Vantage KUL1 Cyberjaya I sits on 6-acre campus, 463,000 sq ft when fully developed in Cyberjaya. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

3f168e10-1fc2-4522-9a7e-0b7751201fa3 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Vantage KUL1 Cyberjaya I?
Vantage KUL1 Cyberjaya I is an AI data center campus tracked on the DEPLOY registry, located in Cyberjaya. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Vantage KUL1 Cyberjaya I?
Vantage Data Centers APAC is recorded as a party to Vantage KUL1 Cyberjaya I on the DEPLOY registry. The full party list, with each role, is on the record.
Is Vantage KUL1 Cyberjaya I operating yet?
As of the most recent verification on the DEPLOY registry, Vantage KUL1 Cyberjaya I is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Vantage KUL1 Cyberjaya I?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Vantage KUL1 Cyberjaya I on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Vantage KUL1 Cyberjaya I: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/vantage-data-centers-apac-vantage-kul1-cyberjaya-i