Vantage KUL2 Cyberjaya II is a tracked AI data center campus in Cyberjaya. Hyperscale AI-oriented campus.

Under construction · Vantage Data Centers APAC · 52-acre campus, ~4.8 million sq ft at full build · Cyberjaya, Malaysia


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Vantage KUL2 Cyberjaya II capacity claims
Source

Key facts

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
436 MW (436 MW critical IT load at full buildout across six buildings)

On the data center map

No mappable coordinate is recorded for Vantage KUL2 Cyberjaya II yet. Location: Cyberjaya.

The deal

Power

Power source
grid
Interconnection

Why here

Vantage KUL2 Cyberjaya II sits on 52-acre campus, ~4.8 million sq ft at full build in Cyberjaya. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

e11d5557-a192-4e58-ae17-6a90e8b93ae9 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Vantage KUL2 Cyberjaya II?
Vantage KUL2 Cyberjaya II is an AI data center campus tracked on the DEPLOY registry, located in Cyberjaya. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Vantage KUL2 Cyberjaya II?
Vantage Data Centers APAC is recorded as a party to Vantage KUL2 Cyberjaya II on the DEPLOY registry. The full party list, with each role, is on the record.
Is Vantage KUL2 Cyberjaya II operating yet?
As of the most recent verification on the DEPLOY registry, Vantage KUL2 Cyberjaya II is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Vantage KUL2 Cyberjaya II?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Vantage KUL2 Cyberjaya II on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Vantage KUL2 Cyberjaya II: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/vantage-data-centers-apac-vantage-kul2-cyberjaya-ii

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces