Overview
Fervo Energy (Nasdaq: FRVO) develops utility-scale enhanced geothermal systems (EGS). Flagship Cape Station GeoCluster in Beaver County, Utah, achieved First Power in Sep 2026 on its first 33 MW GeoBlock, with ~900 MW of contracted offtake including a 396 MW Google PPA.
Verified record
- Verified deployments
- None on file
- Active incidents
- None on file
Key facts
Cape Station First Power (Sep 2026)
Google Cape Station PPA 396 MW (Sep 2026)
Next-generation geothermal
Data & sources
Press releases
2
Web sources
2
4 sources backing this record.View all →
Safety record
No incidents on record for Fervo Energy.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
Full safety record: incidents, sourcing, and exposure data →
Recent coverage
Fervo Energy in third-party press
Recent activity
Every change to this record is dated, sourced, and independently verified where marked.
- Record createdSep 24, 2026
Added to the verified registry
Sources (4)
- https://fervoenergy.com/fervo-energy-achieves-first-power-at-cape-station-a-landmark-moment-for-the-future-of-enhanced-geothermal-systems/ · 2026-09-24
- https://x.com/fervoenergy/status/2103146366017151234 · 2026-09-24
- https://fervoenergy.com/fervo-energy-and-google-sign-396-mw-ppa/ · 2026-09-01
- https://fervoenergy.com/
Common questions
What is Fervo Energy?
What does Fervo Energy make?
Is Fervo Energy publicly traded?
How can I invest in Fervo Energy?
Where is Fervo Energy headquartered?
Who owns Fervo Energy?
Is Fervo Energy a top robotics company?
Is Fervo Energy safe?
Methodology: Verified · 4 sources (2 primary) · last reviewed 2026-09-29
Verification posture
Verified
High confidence
Review state
Stable
Last reviewed 2026-09-29
Sources by quality tier
- 2
- primary-company-ir
- Company IR disclosure
- 2
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for Fervo Energy.In the press
Recent coverage mentioning Fervo Energy from third-party publications. Automatically surfaced; not part of the verified registry record.
Google-backed energy outfit brings 33 MW of 4 GW geothermal potential online in Utah
Fervo Energy aims to have 100 MW online by New Year and half a gigawatt by 2028
Fervo Energy Signs 396 MW Geothermal PPA With Google
Fervo Energy has signed a 396 MW, 15-year power purchase agreement with Google covering the Cape Station GeoCluster in southwest Utah, with the investor presentation reporting…
Machine-readable surfaces
- Markdown mirror: /companies/fervo-energy.md
- RSS feed: /companies/fervo-energy/feed.xml
- JSON-LD: embedded in this page’s head
- REST API: /v1/companies/8afa9d74-31db-4bec-beae-d7bd47242b25
- Revision history: /companies/fervo-energy/history
- Data documentation: /data
- Query this programmatically: Deploy MCP
Reality vs attention
Not enough verified signal yet to place Fervo Energy against peers. Reality and attention percentiles publish once the underlying record clears its data floor.
6-month trend
Analysis
Limited public visibility and press coverage relative to peers.
Signal flags
Dimension breakdown
Verified signal
Attention (reach, not merit)
DEPLOY Intelligence scores are computed from verified registry data: confirmed deployments, disclosed funding rounds, regulatory filings, active job listings, video viewership, and press coverage. Confidence ratings reflect data availability. Scores update nightly.
DEPLOY Indices — verified vs claimed
Last computed: Sep 29, 2026