Overview
Fervo Energy (Nasdaq: FRVO) develops utility-scale enhanced geothermal systems (EGS). Flagship Cape Station GeoCluster in Beaver County, Utah, achieved First Power in Sep 2026 on its first 33 MW GeoBlock, with ~900 MW of contracted offtake including a 396 MW Google PPA.
Reality check
Cape Station First Power (company-claimed)
On Sep 24 2026 Cape Station (Beaver County, Utah) reached First Power, billed as the first grid-synchronized utility-scale greenfield enhanced geothermal system.
Cape Station Phase I (company-claimed)
Sep 2026: About 100 MW as three 33 MW GeoBlocks; first GeoBlock COD targeted by Oct 1 2026, the other two by Jan 1 2027.
Cape Station expansion (company-claimed)
Sep 2026: A next phase of about 400 MW is under construction for 2028 COD; fully contracted offtake at Cape Station is about 900 MW.
Google PPA (company-claimed)
A 396 MW PPA announced Sep 1 2026 for Cape Station capacity expected online in 2028, with an option to add about 600 MW (toward about 1 GW) by June 2030.
Business (company-claimed)
Delivers 24/7 carbon-free energy through next-generation geothermal projects.
Verified record
- Verified deployments
- None on file
- Active incidents
- None on file
Safety record
No incidents on record for Fervo Energy.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
Full safety record: incidents, sourcing, and exposure data →
Recent coverage
Fervo Energy in third-party press
Mentioned on (1)
Registry pages whose text names Fervo Energy.
Companies (1)
Recent activity
Every change to this record is dated, sourced, and independently verified where marked.
- Record createdSep 24, 2026
Added to the verified registry
Sources (4)
- https://fervoenergy.com/fervo-energy-achieves-first-power-at-cape-station-a-landmark-moment-for-the-future-of-enhanced-geothermal-systems/ · 2026-09-24
- https://x.com/fervoenergy/status/2103146366017151234 · 2026-09-24
- https://fervoenergy.com/fervo-energy-and-google-sign-396-mw-ppa/ · 2026-09-01
- https://fervoenergy.com/
Common questions
What is Fervo Energy?
What does Fervo Energy make?
Is Fervo Energy publicly traded?
How can I invest in Fervo Energy?
Where is Fervo Energy headquartered?
Who owns Fervo Energy?
Is Fervo Energy a top robotics company?
Is Fervo Energy safe?
Methodology: Verified · 4 sources (2 primary) · last reviewed 2026-10-13
Verification posture
Verified
High confidence
Review state
Stable
Last reviewed 2026-10-13
Sources by quality tier
- 2
- primary-company-ir
- Company IR disclosure
- 2
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for Fervo Energy.In the press
Recent coverage mentioning Fervo Energy from third-party publications. Automatically surfaced; not part of the verified registry record.
World’s first enhanced geothermal power plant completed in just 23 months
Fervo Energy completed its first power plant in less than two years. The next phases promise to connect to the grid even quicker.
Fervo Energy Hits Geothermal Milestone: Will It Matter For The Stock?
Fervo Energy (FRVO) achieved first grid power at its Cape Station plant, but profitability remains years away and analysts show scattered price targets amid a persistent stock…
Google-backed energy outfit brings 33 MW of 4 GW geothermal potential online in Utah
Fervo Energy aims to have 100 MW online by New Year and half a gigawatt by 2028
Fervo Energy Signs 396 MW Geothermal PPA With Google
Fervo Energy has signed a 396 MW, 15-year power purchase agreement with Google covering the Cape Station GeoCluster in southwest Utah, with the investor presentation reporting…
Machine-readable surfaces
- Markdown mirror: /companies/fervo-energy.md
- RSS feed: /companies/fervo-energy/feed.xml
- JSON-LD: embedded in this page’s head
- REST API: /v1/companies/8afa9d74-31db-4bec-beae-d7bd47242b25
- Revision history: /companies/fervo-energy/history
- Data documentation: /data
- Query this programmatically: Deploy MCP
Reality vs attention
Not enough verified signal yet to place Fervo Energy against peers. Reality and attention percentiles publish once the underlying record clears its data floor.
6-month trend
Analysis
Limited public visibility and press coverage relative to peers.
Dimension breakdown
Verified signal
Attention (reach, not merit)
DEPLOY Intelligence scores are computed from verified registry data: confirmed deployments, disclosed funding rounds, regulatory filings, active job listings, video viewership, and press coverage. Confidence ratings reflect data availability. Scores update nightly.
DEPLOY Indices — verified vs claimed
Last computed: Nov 20, 2026