Data center campus
Digital Edge SEL3 Bupyeong
Digital Edge SEL3 Bupyeong is a tracked AI data center campus in Incheon, South Korea.
Capacity: announced vs energized
Expected online: Q4 2027 (first power). 13 months away..
| Source |
|---|
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- IT capacity (targeted)
- 60 MW by Q4 2027
On the data center map
Every tracked data center is on this map, centered on Digital Edge SEL3 Bupyeong. Pan or zoom out to see how close rivals are building.
- Grid
- live in ~14 months
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
The deal
- developer
- Digital Edge
Power
- Power source
- grid
- Interconnection
Why here
Digital Edge SEL3 Bupyeong is in Incheon, South Korea. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Timeline
- Nov 2026energization date changedintake proposal 0881f369-183b-4d23-aa6b-ee7642288c52
- Nov 2026Current: Under construction
Sources
- Digital Edge SEL3 Bupyeong — digital-edge-dc facility
- Digital Edge Secures Financing to Complete Major Data Center Campus · Digital Edge
6726f332-eeec-4658-ad7e-fcf187b25906 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Digital Edge SEL3 Bupyeong?
Who is building Digital Edge SEL3 Bupyeong?
Is Digital Edge SEL3 Bupyeong operating yet?
How verified is the data on Digital Edge SEL3 Bupyeong?
Deploy Watch
Track Digital Edge SEL3 Bupyeong on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Digital Edge SEL3 Bupyeong: AI data center campus record. Retrieved November 26, 2026, from https://registry.deploy.report/datacenters/digital-edge-dc-digital-edge-sel3-bupyeong
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/digital-edge-dc-digital-edge-sel3-bupyeong.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/digital-edge-dc-digital-edge-sel3-bupyeong
- Data documentation: /data
- Query this programmatically: Deploy MCP