DEPLOYDatabase

Data center campus

Digital Edge PUS1 Busan

Digital Edge PUS1 Busan is a tracked AI data center campus in Busan.

Energized · Digital Edge · Busan, South Korea


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Digital Edge PUS1 Busan capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

Digital Edge

Developer

South Korea

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
4.5 MW (4.5 MW planned; Korea's only DC with integrated cable landing station)

On the data center map

No mappable coordinate is recorded for Digital Edge PUS1 Busan yet. Location: Busan.

The deal

developer
Digital Edge

Power

Power source
grid
Interconnection

Why here

Digital Edge PUS1 Busan is in Busan. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

Sources

4a89e355-0ae9-41e6-b1cd-6681950b9408 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Digital Edge PUS1 Busan?
Digital Edge PUS1 Busan is an AI data center campus tracked on the DEPLOY registry, located in Busan. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Digital Edge PUS1 Busan?
Digital Edge is recorded as a party to Digital Edge PUS1 Busan on the DEPLOY registry. The full party list, with each role, is on the record.
Is Digital Edge PUS1 Busan operating yet?
As of the most recent verification on the DEPLOY registry, Digital Edge PUS1 Busan is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Digital Edge PUS1 Busan?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Digital Edge PUS1 Busan on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Digital Edge PUS1 Busan: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/digital-edge-dc-digital-edge-pus1-busan

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces