DEPLOYDatabase

Data center campus

Digital Edge CGK Hyperscale Campus

Digital Edge CGK Hyperscale Campus is a tracked AI data center campus in Cikarang.

Under construction · Digital Edge · Cikarang, Indonesia


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Digital Edge CGK Hyperscale Campus capacity claims
Source

Key facts

0 GW

Energized

Digital Edge

Developer

Indonesia

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
500 MW (500 MW announced at Greenland Industrial Center, scalable to 1 GW)

On the data center map

No mappable coordinate is recorded for Digital Edge CGK Hyperscale Campus yet. Location: Cikarang.

The deal

developer
Digital Edge

Power

Power source
grid
Interconnection

Why here

Digital Edge CGK Hyperscale Campus is in Cikarang. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

24c7acc1-9891-46d1-90bd-cb1fe474380c · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Digital Edge CGK Hyperscale Campus?
Digital Edge CGK Hyperscale Campus is an AI data center campus tracked on the DEPLOY registry, located in Cikarang. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Digital Edge CGK Hyperscale Campus?
Digital Edge is recorded as a party to Digital Edge CGK Hyperscale Campus on the DEPLOY registry. The full party list, with each role, is on the record.
Is Digital Edge CGK Hyperscale Campus operating yet?
As of the most recent verification on the DEPLOY registry, Digital Edge CGK Hyperscale Campus is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Digital Edge CGK Hyperscale Campus?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Digital Edge CGK Hyperscale Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Digital Edge CGK Hyperscale Campus: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/digital-edge-dc-digital-edge-cgk-hyperscale-campus

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces