DEPLOYDatabase

Data center campus

Digital Edge SEL5 Ansan

Energized · Digital Edge · Ansan, Gyeonggi-do, South Korea


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Digital Edge SEL5 Ansan capacity claims
Source

Key facts

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
60 MW (60 MW operational per operator site)

On the data center map

Every tracked data center is on this map, centered on Digital Edge SEL5 Ansan. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

developer
Digital Edge

Power

Power source
grid
Interconnection

Why here

Digital Edge SEL5 Ansan. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

19e89376-2250-450c-99f9-cd4802e068c0 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Digital Edge SEL5 Ansan?
Digital Edge SEL5 Ansan is an AI data center campus tracked on the DEPLOY registry, located in Ansan, Gyeonggi-do, South Korea. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Digital Edge SEL5 Ansan?
Digital Edge is recorded as a party to Digital Edge SEL5 Ansan on the DEPLOY registry. The full party list, with each role, is on the record.
Is Digital Edge SEL5 Ansan operating yet?
As of the most recent verification on the DEPLOY registry, Digital Edge SEL5 Ansan is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Digital Edge SEL5 Ansan?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Digital Edge SEL5 Ansan on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Digital Edge SEL5 Ansan: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/digital-edge-dc-digital-edge-sel5-ansan

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces