Data center facility
EdgeConneX New Albany
EdgeConneX · New Albany · 9850 Innovation Campus Way, New Albany, OH. Every figure below is individually sourced and dated.
Part of the tracked campus EdgeConneX / PowerConneX New Albany Energy Center.
In clusterOhio(141)
The deal
Inherited from campus EdgeConneX / PowerConneX New Albany Energy Center.
- operator
- EdgeConneX · data center operator / power offtaker
- developer
- PowerConneX Inc. · affiliate developing on-site generation via PowerConneX New Albany 2, LLC
- financier
- EQT · Investment-firm parent/owner of EdgeConneX (tracker-reported)
- grid operator
- PJM Interconnection · New Albany OH sits in AEP Ohio / PJM territory; plant itself is behind-the-meter and off-grid
Power
Inherited from campus EdgeConneX / PowerConneX New Albany Energy Center. Live grid demand and drought overlay only render on the campus page.
- Power source
- behind the meter gas
- Grid operator
- PJM
- Interconnection
PCX New Albany Energy Center Phase 1, 0.14 GW gas, Announced. OPSB Case No. 25-90-EL-BGN, certificate 2025-07-22; behind-the-meter, not grid-connected
PCX New Albany Energy Center Phase 2, 0.22 GW gas, Announced. OPSB Case No. 25-302-EL-BGN, certificate 2025-11-20; includes battery storage
PowerConneX New Albany Energy Center (Phase 1), 0.14 GW gas, Under construction. Off-grid / behind-the-meter natural-gas plant, up to 140 MW, OPSB Case 25-90-EL-BLN certificated 2025-07-22, ~48.6 acres; primary power to co-located data center
PowerConneX New Albany Energy Center (Phase 1) generating equipment, 0.13 GW gas, Under construction. Tracker-reported engine nameplate: Jenbacher J624/J620 reciprocating gas engines plus Mainspring linear generators (~126 MW summed), under the 140 MW certificated cap
Facility record
On the data center map
Construction evidence
Dated satellite imagery of the site itself, oldest to newest, with the campus milestones that landed in each window. This is what the site looked like from orbit while announcements, permits, and energizations were dated into our ledger, so bare land, grading, and building mass tell their own story alongside the paper trail. Sentinel-2 true color, 10 m resolution, cloud-free scenes; click any frame to expand it.
Delivery paceAnnounced Q3 2025 · not yet energized
Dated Sentinel-2 imagery, gated to hand-verified site coordinates. Milestones inherited from campus EdgeConneX / PowerConneX New Albany Energy Center. How we source and verify it: satellite construction evidence.
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
- buildingSqft: 524525 (reported) · source · Phase I warehouse conversion; Phase II adds a separate 700k sqft building (not counted here)
- record: EdgeConneX New Albany (reported) · source
- status: announced (Coming Soon) (reported) · source
- streetAddress: 9850 Innovation Campus Way, New Albany, OH (reported) · source
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Aug 2026Current: announced
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is EdgeConneX New Albany?
Who operates EdgeConneX New Albany?
Is EdgeConneX New Albany operating?
How verified is the data on EdgeConneX New Albany?
Deploy Watch
Track EdgeConneX New Albany on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). EdgeConneX New Albany: data center facility record. Retrieved August 29, 2026, from https://registry.deploy.report/datacenters/facilities/edgeconnex-new-albany-oh
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/edgeconnex-new-albany-oh.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/edgeconnex-new-albany-oh
- Data documentation: /data
- Query this programmatically: Deploy MCP