Data center facility

EdgeConneX New Albany

EdgeConneX · New Albany · 9850 Innovation Campus Way, New Albany, OH. Every figure below is individually sourced and dated.


Part of the tracked campus EdgeConneX / PowerConneX New Albany Energy Center.

In clusterOhio(141)

The deal

Inherited from campus EdgeConneX / PowerConneX New Albany Energy Center.

operator
EdgeConneX · data center operator / power offtaker
developer
PowerConneX Inc. · affiliate developing on-site generation via PowerConneX New Albany 2, LLC
financier
EQT · Investment-firm parent/owner of EdgeConneX (tracker-reported)
grid operator
PJM Interconnection · New Albany OH sits in AEP Ohio / PJM territory; plant itself is behind-the-meter and off-grid

Power

Inherited from campus EdgeConneX / PowerConneX New Albany Energy Center. Live grid demand and drought overlay only render on the campus page.

Power source
behind the meter gas
Grid operator
PJM
Interconnection

PCX New Albany Energy Center Phase 1, 0.14 GW gas, Announced. OPSB Case No. 25-90-EL-BGN, certificate 2025-07-22; behind-the-meter, not grid-connected

PCX New Albany Energy Center Phase 2, 0.22 GW gas, Announced. OPSB Case No. 25-302-EL-BGN, certificate 2025-11-20; includes battery storage

PowerConneX New Albany Energy Center (Phase 1), 0.14 GW gas, Under construction. Off-grid / behind-the-meter natural-gas plant, up to 140 MW, OPSB Case 25-90-EL-BLN certificated 2025-07-22, ~48.6 acres; primary power to co-located data center

PowerConneX New Albany Energy Center (Phase 1) generating equipment, 0.13 GW gas, Under construction. Tracker-reported engine nameplate: Jenbacher J624/J620 reciprocating gas engines plus Mainspring linear generators (~126 MW summed), under the 140 MW certificated cap

Facility record

announced

Status

colocation

Type

EdgeConneX

Operator

New Albany

Location

524,525 sqft

Building

On the data center map

Free to use on your site, with a link back to DEPLOY.

Construction evidence

Dated satellite imagery of the site itself, oldest to newest, with the campus milestones that landed in each window. This is what the site looked like from orbit while announcements, permits, and energizations were dated into our ledger, so bare land, grading, and building mass tell their own story alongside the paper trail. Sentinel-2 true color, 10 m resolution, cloud-free scenes; click any frame to expand it.

Delivery paceAnnounced Q3 2025 · not yet energized

2018-06-14Contains modified Copernicus Sentinel data 2018
2020-06-08Contains modified Copernicus Sentinel data 2020
2022-06-03Contains modified Copernicus Sentinel data 2022
2024-09-05Contains modified Copernicus Sentinel data 2024
2025-08-01Contains modified Copernicus Sentinel data 2025

Dated Sentinel-2 imagery, gated to hand-verified site coordinates. Milestones inherited from campus EdgeConneX / PowerConneX New Albany Energy Center. How we source and verify it: satellite construction evidence.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • buildingSqft: 524525 (reported) · source · Phase I warehouse conversion; Phase II adds a separate 700k sqft building (not counted here)
  • record: EdgeConneX New Albany (reported) · source
  • status: announced (Coming Soon) (reported) · source
  • streetAddress: 9850 Innovation Campus Way, New Albany, OH (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: announced

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is EdgeConneX New Albany?
EdgeConneX New Albany is a data center facility record on the DEPLOY registry, in New Albany. Every fact on the record is individually sourced and dated.
Who operates EdgeConneX New Albany?
EdgeConneX operates EdgeConneX New Albany, per the sourced record on the DEPLOY registry.
Is EdgeConneX New Albany operating?
EdgeConneX New Albany is recorded as announced on the DEPLOY registry. Each figure traces to a source.
How verified is the data on EdgeConneX New Albany?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track EdgeConneX New Albany on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). EdgeConneX New Albany: data center facility record. Retrieved August 29, 2026, from https://registry.deploy.report/datacenters/facilities/edgeconnex-new-albany-oh

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces