YTL Green Data Center Park is an AI data center campus developed by YTL AI Cloud in Johor, Kulai. 0.50 GW of capacity has been announced; 0.05 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Partially energized · YTL AI Cloud · Private land · Tenaga Nasional Berhad (TNB) · Kulai, Johor, Malaysia


Capacity: announced vs energized

Announced-to-energized gap: 0.45 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Promised online: 2026. Energized capacity is now on record. Claimed by YTL Power (source).

YTL Green Data Center Park capacity claims
Source
Announced0.50 GW2025-10-31reportedpress release
Energized0.05 GW2025-10-31verifiedjournalist report
Under construction0.30 GW2025-10-31reportedpress release

Key facts

0.50 GW

Announced

0.05 GW

Energized

YTL AI Cloud

Developer

Malaysia

Location

0.45 GW

Announced-to-energized gap

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

First NVIDIA AI facility online (company / press)
Oct 31 2025 The Edge reported YTL Power announced completion of its first NVIDIA-powered AI data centre at the YTL Green Data Center Park in Kulai, Johor, with YTL AI Cloud now operational on liquid-cooled NVL72 Grace Blackwell (GB200) GPUs (The Edge Malaysia, Oct 31 2025)
Campus acreage / solar (press)
The Edge cites a 1,640-acre campus in Johor running on renewable energy from a 500 MW solar plant, and frames the park at 600 MW in the company update to Malaysian officials (The Edge Malaysia, Oct 31 2025)
JDC2 IT load / offtake (press)
Nov 4 2025 The Star reported the completed AI facility is a 20 MW JDC2 site fitted with NVIDIA GB200 NVL72 GPUs, with part of capacity contracted by an undisclosed US offtaker and the rest used by YTL for its LLM and AI solutions (The Star, Nov 4 2025)
Buildout phases (press)
The Star describes the wider park as a proposed ~500 MW Green Data Centre Park with about 300 MW being built and commissioned, JDC3 at 80 MW (half targeted by Sep 2025, rest 2026), and JDC4 at 40 MW IT load for a US hyperscaler in three phases through 2027 (The Star, Nov 4 2025)
Sovereign AI / ILMU (press)
TechNode Global quotes YTL Power MD Yeoh Seok Hong saying the operational YTL AI Cloud plus ILMU (Malaysian-developed LLM) advance Malaysia sovereign AI, with NVIDIA partnership framed as a major step (TechNode Global, Nov 3 2025)

On the data center map

Every tracked data center is on this map, centered on YTL Green Data Center Park. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.
The story of YTL Green Data Center Park
Announced capex
$2.1B
Cooling
Liquid-cooled Nvidia GB200 Grace Blackwell (NVL72)
Derived
Cost per MW
$4M/MW

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterJohor(10)

The deal

developer
YTL Power International / YTL Data Center Holdings · Owner-operator of the 1,640-acre park; runs YTL AI Cloud.
tenant
YTL AI Cloud · Sovereign/government and citizen AI services host on the first energized facility.
chip supplier
NVIDIA · Liquid-cooled GB200 NVL72 Grace Blackwell GPUs; strategic partner in the RM10bn project.
tenant
Sea Limited · Anchor tenant of the first phase (Sea Data Center), RM1.5 billion groundbreaking.
developer
YTL AI Cloud

Power

Power source
mixed
Interconnection

On-site solar plant, 0.50 GW solar, Under construction. 500 MW solar plant co-powering Malaysia's first renewable-powered hyperscale data center park.

National grid backup supply, 0.60 GW grid, Announced. 600 MW backup supply from the national grid (TNB).

Why here

YTL Green Data Center Park sits on private land in Johor, Kulai. It connects to the Tenaga Nasional Berhad (TNB) grid, draws on mixed power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

YTL Power - Nvidia AI data center project
$2.1B. RM10bn YTL Power / Nvidia project at Kulai; part of a broader ~$4.3bn Malaysia buildout reported by DCD. journalist report
Total project (YTL Power / Nvidia)
RM10 billion total project value; USD not disclosed journalist report
First-phase Sea Data Center investment
RM1.5 billion first phase (up to 72 MW), anchored by Sea Ltd; USD not disclosed press release

Investment, workforce and specs

Cooling
Liquid-cooled Nvidia GB200 Grace Blackwell (NVL72) source

Timeline

  1. Aug 2026
    party linked
    tenant: linked externalName "YTL AI Cloud" to company ytl-ai
  2. Oct 2026
    Current: Partially energized

Sources

6c37130e-35d9-4987-8196-9ab3f0882584 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is YTL Green Data Center Park?
YTL Green Data Center Park is an AI data center campus tracked on the DEPLOY registry, located in Kulai. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will YTL Green Data Center Park use?
YTL Green Data Center Park has 0.50 GW of announced capacity on the DEPLOY registry, of which 0.05 GW is recorded as energized, an announced-to-energized gap of 0.45 GW. Each figure is individually dated and sourced.
Who is building YTL Green Data Center Park?
YTL AI Cloud is recorded as a party to YTL Green Data Center Park on the DEPLOY registry. The full party list, with each role, is on the record.
Is YTL Green Data Center Park operating yet?
As of the most recent verification on the DEPLOY registry, YTL Green Data Center Park is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on YTL Green Data Center Park?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track YTL Green Data Center Park on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). YTL Green Data Center Park: AI data center campus record. Retrieved October 4, 2026, from https://registry.deploy.report/datacenters/ytl-green-data-center-park-kulai-johor

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces