Largest U.S.

HQ
Audubon, Pennsylvania, USA
Status
Nonprofit

Overview

Largest U.S. regional transmission organization / grid operator, spanning Mid-Atlantic and Midwest states plus D.C. Tracked for AI data-center power and interconnection: on Sep 30 2026 delayed a planned reliability backstop capacity auction after partial FERC approval of its data-center-driven procurement framework (Utility Dive reporting).

Reality check

Role (company-claimed)

A regional transmission organization coordinating wholesale electricity in all or parts of 13 states and DC.

Open FERC issues (company-claimed)

Cost allocation, transmission-owner exit rules and load-serving entity collateral.

Verified record

Verified deployments
None on file
Active incidents
None on file

Key facts

Backstop target (reported, Sep 2026)

PJM aimed to buy about 6.8 GW of new capacity to cover a shortfall from the 2028/29 capacity auction.

DOE Order 202-26-50 (government-stated)

DOE Order 202-26-50 (Oct 12) for PJM, effective Oct 13-16: dispatch specified units and, as last resort, backup generation at large loads amid high demand and maintenance outages.

Backstop procurement suspended (government-stated)

FERC accepted PJM's Reliability Backstop Procurement on Sep 29 2026 but suspended it five months, to a Feb 28 2027 effective date. PJM dropped the Sep 30 start; new timing not set.

Large Load order (government-stated, Oct 2026)

FERC on Oct 9 2026 accepted PJM's Large Load definition and Large Load Registry, effective Oct 12, and rejected the IRAS curtailment framework and BYONC rules.

Large Load threshold (government-stated)

50 MW cumulative peak at one site, with affiliated loads within a one-mile radius combined and co-located and behind-the-meter loads included.

Data & sources

Government records

2

Web sources

9

11 sources backing this record.View all →

PJM Interconnection on the deployment map

View the global map

PJM Interconnection has no verified deployments on the DEPLOY registry yet. Explore the deployment map by place and type.

Free to use on your site, with a link back to DEPLOY.

No verified deployments for PJM Interconnection on the DEPLOY record yet. Track PJM Interconnection to know the moment the first one is verified.

Safety record

No incidents on record for PJM Interconnection.

Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.

Full safety record: incidents, sourcing, and exposure data →

Recent coverage

PJM Interconnection in third-party press

Mentioned on (3)

Registry pages whose text names PJM Interconnection.