DEPLOYDatabase

Data center campus

Digital Edge OSA2 Osaka

Energized · Digital Edge · Osaka, Japan (Kansai International Airport)


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Digital Edge OSA2 Osaka capacity claims
Source

Key facts

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
operational; capacity not disclosed on operator site

On the data center map

No mappable coordinate is recorded for Digital Edge OSA2 Osaka yet. Location: Osaka, Japan (Kansai International Airport).

The deal

developer
Digital Edge

Power

Power source
grid
Interconnection

Why here

Digital Edge OSA2 Osaka is in Osaka, Japan (Kansai International Airport). It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

da41b10a-f2bd-46dc-9329-c4f9edde1752 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Digital Edge OSA2 Osaka?
Digital Edge OSA2 Osaka is an AI data center campus tracked on the DEPLOY registry, located in Osaka, Japan (Kansai International Airport). DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Digital Edge OSA2 Osaka?
Digital Edge is recorded as a party to Digital Edge OSA2 Osaka on the DEPLOY registry. The full party list, with each role, is on the record.
Is Digital Edge OSA2 Osaka operating yet?
As of the most recent verification on the DEPLOY registry, Digital Edge OSA2 Osaka is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Digital Edge OSA2 Osaka?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Digital Edge OSA2 Osaka on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Digital Edge OSA2 Osaka: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/digital-edge-dc-digital-edge-osa2-osaka

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces