Digital Edge TYO4-6 Yokohama Campus

Digital Edge TYO4-6 Yokohama Campus is a tracked AI data center campus in Yokohama, Japan.

Energized · Digital Edge · Yokohama, Japan


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Digital Edge TYO4-6 Yokohama Campus capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

Digital Edge

Developer

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
18.5 MW (18.5 MW operational across TYO4/5/6)

On the data center map

Every tracked data center is on this map, centered on Digital Edge TYO4-6 Yokohama Campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

developer
Digital Edge

Power

Power source
grid
Interconnection

Why here

Digital Edge TYO4-6 Yokohama Campus is in Yokohama, Japan. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

dc15934c-0b1a-4587-a28b-abf98894d7dd · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Digital Edge TYO4-6 Yokohama Campus?
Digital Edge TYO4-6 Yokohama Campus is an AI data center campus tracked on the DEPLOY registry, located in Yokohama, Japan. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Digital Edge TYO4-6 Yokohama Campus?
Digital Edge is recorded as a party to Digital Edge TYO4-6 Yokohama Campus on the DEPLOY registry. The full party list, with each role, is on the record.
Is Digital Edge TYO4-6 Yokohama Campus operating yet?
As of the most recent verification on the DEPLOY registry, Digital Edge TYO4-6 Yokohama Campus is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Digital Edge TYO4-6 Yokohama Campus?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Digital Edge TYO4-6 Yokohama Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Digital Edge TYO4-6 Yokohama Campus: AI data center campus record. Retrieved September 23, 2026, from https://registry.deploy.report/datacenters/digital-edge-dc-digital-edge-tyo4-6-yokohama-campus

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces