DEPLOYDatabase

Data center campus

Microsoft Quantum Lab Copenhagen (Magne)

Microsoft Quantum Lab Copenhagen is a tracked AI data center campus in Copenhagen, Denmark. Microsoft's largest quantum R&D site, sited in Lyngby just north of Copenhagen and rooted in a long-running collaboration with the Niels Bohr Institute at the University of Copenhagen. The site pairs the original 2018 Mi

Energized · Microsoft · university · other · Copenhagen, Denmark, Denmark, Europe


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Microsoft Quantum Lab Copenhagen (Magne) capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

Microsoft

Developer

Europe

Location

other

Grid

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Significance
Microsoft's largest quantum site
Lab name
Magne (quantum supercomputer for 2026)
Technology
Topological quantum computing (Majorana)
Chips
Majorana 1 (Feb 2025), Majorana 2
Goal
Machines with commercial value by end of decade
Chip
Majorana 1 (Feb 2025), Majorana 2
Investment
>DKK 1 billion (~$156M USD) cumulative
Majorana 1
8 topological qubits, topoconductors (indium arsenide + aluminum)
Opened
Original lab 2018, expansion Nov 2025
Location
Lyngby, Denmark (Kongens Lyngby, ~15 km north of central Copenhagen, adjacent to Niels Bohr Institute collaborators)
Second lab
November 2025 expansion added a second building 25 to 50 meters from the original 2018 lab, forming a single quantum site
Total investment
Microsoft's Denmark quantum investment exceeds 1 billion DKK (~$156M USD) as of Nov 2025
Cleanroom
AI-enabled cleanroom fabricates the full 'heart' of Majorana topological-qubit chips on site
Workforce
Multidisciplinary team of physicists, materials scientists, and micro/nanofab experts across 20+ nationalities
Magne system
50 logical qubits / 1,225 physical neutral-atom qubits, built by Atom Computing with Microsoft software stack
Magne owner
QuNorth, a 50/50 JV of EIFO (Danish state) and the Novo Nordisk Foundation, €80M acquisition
Magne timeline
Construction from autumn 2025, targeted operational late 2026 / early 2027 as first commercially available Level 2 quantum computer
University tie
Long-running collaboration with Niels Bohr Institute, University of Copenhagen (origin of the Microsoft Quantum Materials Lab)

On the data center map

Every tracked data center is on this map, centered on Microsoft Quantum Lab Copenhagen. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

operator
Microsoft

Power

Power source
grid
Grid operator
other
Interconnection
Water
Quantum research facility relies on dilution-refrigerator cryogenics (millikelvin cooling of topological qubit test chips) rather than water-intensive process cooling; no disclosed water source.

Why here

Microsoft Quantum Lab Copenhagen sits on university in Copenhagen, Denmark. It connects to the other grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Microsoft Copenhagen quantum lab (Magne)
$100M news

Sources

db661aa5-6bdb-46a8-aab6-7a263ef47dcc · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Microsoft Quantum Lab Copenhagen (Magne)?
Microsoft Quantum Lab Copenhagen (Magne) is an AI data center campus tracked on the DEPLOY registry, located in Copenhagen, Denmark. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Microsoft Quantum Lab Copenhagen (Magne)?
Microsoft is recorded as a party to Microsoft Quantum Lab Copenhagen (Magne) on the DEPLOY registry. The full party list, with each role, is on the record.
Is Microsoft Quantum Lab Copenhagen (Magne) operating yet?
As of the most recent verification on the DEPLOY registry, Microsoft Quantum Lab Copenhagen (Magne) is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Microsoft Quantum Lab Copenhagen (Magne)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Microsoft Quantum Lab Copenhagen (Magne) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Microsoft Quantum Lab Copenhagen (Magne): AI data center campus record. Retrieved August 26, 2026, from https://registry.deploy.report/datacenters/microsoft-quantum-lab-copenhagen

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces