DEPLOYDatabase

Data center campus

Microsoft LVL-16 Datacenter Campus (Mecklenburg County, Virginia)

Microsoft LVL-16 Datacenter Campus is a tracked AI data center campus in Virginia. Microsoft has applied to the U.S. Army Corps of Engineers Norfolk District to build the LVL-16 Datacenter Campus on three parcels totaling 316.7 acres north of Phillis Road, east of Rose Hill Road and south of Tobacco He

Announced · Microsoft · Virginia, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Microsoft LVL-16 Datacenter Campus (Mecklenburg County, Virginia) capacity claims
Source

Key facts

announced

Lifecycle

0 GW

Energized

Microsoft

Developer

On the data center map

Every tracked data center is on this map, centered on Microsoft LVL-16 Datacenter Campus. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a county-level coordinate for this campus, not a verified site coordinate, so the marker shows the county rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.

In clusterVirginia(345)

The deal

developer
Microsoft

Power

Interconnection

County water status: Moderate drought (D1) in Buckingham County, week of 2026-11-17 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Microsoft LVL-16 Datacenter Campus is in Virginia. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States

Timeline

  1. Nov 2026
    party added
    developer: b8670b58-67f2-4b87-9b46-9e16588dc1e6
  2. Nov 2026
    Current: Announced

Sources

8b5be63c-5bd3-4fa4-866b-e27839d6deea · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Microsoft LVL-16 Datacenter Campus (Mecklenburg County, Virginia)?
Microsoft LVL-16 Datacenter Campus (Mecklenburg County, Virginia) is an AI data center campus tracked on the DEPLOY registry, located in Virginia. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Microsoft LVL-16 Datacenter Campus (Mecklenburg County, Virginia)?
Microsoft is recorded as a party to Microsoft LVL-16 Datacenter Campus (Mecklenburg County, Virginia) on the DEPLOY registry. The full party list, with each role, is on the record.
Is Microsoft LVL-16 Datacenter Campus (Mecklenburg County, Virginia) operating yet?
As of the most recent verification on the DEPLOY registry, Microsoft LVL-16 Datacenter Campus (Mecklenburg County, Virginia) is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Microsoft LVL-16 Datacenter Campus (Mecklenburg County, Virginia)?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Microsoft LVL-16 Datacenter Campus (Mecklenburg County, Virginia) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Microsoft LVL-16 Datacenter Campus (Mecklenburg County, Virginia): AI data center campus record. Retrieved November 23, 2026, from https://registry.deploy.report/datacenters/microsoft-lvl-16-datacenter-campus-mecklenburg-county-virginia

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces