DEPLOYDatabase

Data center campus

Teraco CT1 Rondebosch

Teraco CT1 Rondebosch is a tracked AI data center campus in Cape Town. Teraco's first Cape Town facility in Rondebosch.

Energized · Teraco Data Environments · Cape Town


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Teraco CT1 Rondebosch capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

Cape Town

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
5 MW (5 MW IT load, 2,500 sqm white space)

On the data center map

No mappable coordinate is recorded for Teraco CT1 Rondebosch yet. Location: Cape Town.

The deal

Power

Power source
grid
Interconnection

Why here

Teraco CT1 Rondebosch is in Cape Town. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

42982659-2209-4530-83f3-f19916f91670 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Teraco CT1 Rondebosch?
Teraco CT1 Rondebosch is an AI data center campus tracked on the DEPLOY registry, located in Cape Town. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Teraco CT1 Rondebosch?
Teraco Data Environments is recorded as a party to Teraco CT1 Rondebosch on the DEPLOY registry. The full party list, with each role, is on the record.
Is Teraco CT1 Rondebosch operating yet?
As of the most recent verification on the DEPLOY registry, Teraco CT1 Rondebosch is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Teraco CT1 Rondebosch?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Teraco CT1 Rondebosch on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Teraco CT1 Rondebosch: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/teraco-ct1-rondebosch

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces