Teraco DB1 Riverhorse Valley is a tracked AI data center campus in Durban. Teraco's sole Durban facility in Riverhorse Valley.

Energized · Teraco Data Environments · Durban


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Teraco DB1 Riverhorse Valley capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

Durban

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
2 MW (2 MW IT load, 1,500 sqm white space)

On the data center map

No mappable coordinate is recorded for Teraco DB1 Riverhorse Valley yet. Location: Durban.

The deal

Power

Power source
grid
Interconnection

Why here

Teraco DB1 Riverhorse Valley is in Durban. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

28115e34-8d97-4a4e-b0c9-a0e9159cedd5 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Teraco DB1 Riverhorse Valley?
Teraco DB1 Riverhorse Valley is an AI data center campus tracked on the DEPLOY registry, located in Durban. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Teraco DB1 Riverhorse Valley?
Teraco Data Environments is recorded as a party to Teraco DB1 Riverhorse Valley on the DEPLOY registry. The full party list, with each role, is on the record.
Is Teraco DB1 Riverhorse Valley operating yet?
As of the most recent verification on the DEPLOY registry, Teraco DB1 Riverhorse Valley is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Teraco DB1 Riverhorse Valley?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Teraco DB1 Riverhorse Valley on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Teraco DB1 Riverhorse Valley: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/teraco-db1-riverhorse-valley

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces