Data center campus
Teraco CT2 Brackenfell
Teraco CT2 Brackenfell is a tracked AI data center campus in Cape Town. Hyperscale extension of the Cape Town campus in Brackenfell.
Capacity: announced vs energized
Expected online: November 10, 2025 (next phase). 13 months past the claimed date, with no energized capacity on record..The expected date has moved 1 time: Q1 2025, then November 10, 2025.
| Source |
|---|
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- IT capacity
- 50 MW committed at full build; 18,000 sq m white space
On the data center map
No mappable coordinate is recorded for Teraco CT2 Brackenfell yet. Location: Cape Town.
- Grid
- due 2025
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
The deal
- developer
- Teraco Data Environments
Power
- Power source
- grid
- Interconnection
Why here
Teraco CT2 Brackenfell is in Cape Town. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Timeline
- Nov 2026energization date changedintake proposal e3a4d8f2-0c3a-4673-bad3-bc574c2705f7
- Nov 2026Current: Partially energized
Sources
58d14d57-abf6-41e1-a873-0a56e9679e8c · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Teraco CT2 Brackenfell?
Who is building Teraco CT2 Brackenfell?
Is Teraco CT2 Brackenfell operating yet?
How verified is the data on Teraco CT2 Brackenfell?
Deploy Watch
Track Teraco CT2 Brackenfell on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Teraco CT2 Brackenfell: AI data center campus record. Retrieved November 27, 2026, from https://registry.deploy.report/datacenters/teraco-ct2-brackenfell
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/teraco-ct2-brackenfell.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/teraco-ct2-brackenfell
- Data documentation: /data
- Query this programmatically: Deploy MCP