Teraco JB1 Isando is a tracked AI data center campus in Johannesburg. Teraco's first vendor-neutral colo facility in Isando, Johannesburg. Part of the Isando campus with JB3 and JB5.

Energized · Teraco Data Environments · Johannesburg


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Teraco JB1 Isando capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

Johannesburg

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
70 MW (70 MW IT load reported across JB1+JB3+JB5 Isando campus (Teraco site); JB1 is the original Isando facility)

On the data center map

No mappable coordinate is recorded for Teraco JB1 Isando yet. Location: Johannesburg.

The deal

Power

Power source
grid
Interconnection

Why here

Teraco JB1 Isando is in Johannesburg. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

24b831a2-2396-44d3-bbd4-40d2c7fe4e5c · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Teraco JB1 Isando?
Teraco JB1 Isando is an AI data center campus tracked on the DEPLOY registry, located in Johannesburg. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Teraco JB1 Isando?
Teraco Data Environments is recorded as a party to Teraco JB1 Isando on the DEPLOY registry. The full party list, with each role, is on the record.
Is Teraco JB1 Isando operating yet?
As of the most recent verification on the DEPLOY registry, Teraco JB1 Isando is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Teraco JB1 Isando?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Teraco JB1 Isando on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Teraco JB1 Isando: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/teraco-jb1-isando