DEPLOYDatabase

Data center campus

Teraco JB3 Isando

Teraco JB3 Isando is a tracked AI data center campus in Johannesburg. Second Isando facility, adjacent to JB1.

Energized · Teraco Data Environments · Johannesburg


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Teraco JB3 Isando capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

Johannesburg

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
part of Isando campus 32,000 sqm white space

On the data center map

No mappable coordinate is recorded for Teraco JB3 Isando yet. Location: Johannesburg.

The deal

Power

Power source
grid
Interconnection

Why here

Teraco JB3 Isando is in Johannesburg. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

9bd14f0d-c657-4443-84be-f9f4545cb3b7 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Teraco JB3 Isando?
Teraco JB3 Isando is an AI data center campus tracked on the DEPLOY registry, located in Johannesburg. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Teraco JB3 Isando?
Teraco Data Environments is recorded as a party to Teraco JB3 Isando on the DEPLOY registry. The full party list, with each role, is on the record.
Is Teraco JB3 Isando operating yet?
As of the most recent verification on the DEPLOY registry, Teraco JB3 Isando is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Teraco JB3 Isando?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Teraco JB3 Isando on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Teraco JB3 Isando: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/teraco-jb3-isando

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces