Robot model
BOD2
COBOD's BOD2 is a gantry-based 3D construction printer that extrudes concrete layer by layer to build wall structures on site; the modular gantry scales to…
- Manufacturer
- COBOD
- Form factor
- construction
- Maturity
- commercial
- Lifecycle
- active
- Deployments
- 1
- Website
- cobod.com ↗
Overview
COBOD's BOD2 is a gantry-based 3D construction printer that extrudes concrete layer by layer to build wall structures on site; the modular gantry scales to different building sizes. The newer BOD3 adds a ground-track for continuous linear printing of multiple buildings.
Verified vs. claimed
- Maturity stage
- commercial(Commercially deployed with revenue-generating operations.)
- Sources on file
- View all sources →
Key facts
Product line
Reach (company-stated)
Backers
Print envelope (2021 spec sheet)
Weight and power (2021 spec sheet)
Specs
Class
Method
Max speed
Weight kg
Data & sources
Press releases
1
Web sources
1
2 sources backing this record.View all →
Pricing
No verified price is on record for BOD2. Physical-AI systems are often sold through enterprise contracts or operated as a service rather than at a public list price.
Deployments (1)
- BOD2 at Tempeoperational
A COBOD BOD2 gantry printer was used to 3D-print the concrete walls of a Habitat for Humanity home (about 1,740 square feet) in Tempe, Arizona.
BOD2 on the deployment map
View the global mapWhere BOD2 is verified operating. Explore the deployment map by place and type.
Recent activity
Every change to this record is dated, sourced, and independently verified where marked.
- Record createdJun 24, 2026
Added to the verified registry
- Deployment verifiedVerifiedNov 1, 2021
at Tempe
Safety record
No incidents on record for BOD2.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
Sources (2)
Mentioned on (1)
Registry pages whose text names BOD2.
Companies (1)
Common questions
What is BOD2?
How much does BOD2 cost?
Is BOD2 actually deployed in the real world?
What are the specs of BOD2?
Who makes BOD2?
Where is BOD2 deployed?
Can you buy BOD2?
What are alternatives to BOD2?
How does BOD2 compare to Brokk 170?
Is BOD2 a top construction?
What is BOD2's maturity stage?
Is BOD2 safe?
What is the COBOD BOD2 construction robot?
Methodology: Verified · 2 sources (1 primary) · last reviewed 2026-10-10
Verification posture
Verified
High confidence
Review state
Stable
Last reviewed 2026-10-10
Maturity + lifecycle
Maturity stage: commercial
Lifecycle: active
Architectural position
Cohort: construction
Sources by quality tier
- 1
- unclassified
- Unclassified source
- 1
- primary-company-ir
- Company IR disclosure
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for BOD2.Recent coverage
BOD2 in third-party press
Attention vs reality over time
Media mentions per month (area) against verified deployment events (dots). A press spike over a flat deployment line is the hype gap, drawn over time.
In the press
Recent coverage mentioning BOD2 from third-party publications. Automatically surfaced; not part of the verified registry record.
Matthäi opens a construction 3D printing division
Construction group Matthäi Schlüsselfertigbau has established an in-house construction 3D printing division following the completion of its own headquarters in Selsingen, Lower…
Germany’s Matthäi prints headquarters and opens new division
German construction engineering company Matthäi has created a printing division following the completion of a 364-sq-m, two-story headquarters in Selsingen, Lower Saxony, using a…
German construction giant launches 3D printing division after printing new headquarters
Matthäi Schlüsselfertigbau, a subsidiary of the German construction giant Matthäi, has established its own construction 3D printing division. The decision followed the successful…
Europe’s largest 3D-printed apartment building completed months ahead of schedule
Europe's largest 3DCP project printed in Denmark
COBOD printed Europe's largest 3D construction printing project at 1,654 m2 in Denmark, a major milestone for the technology.
"Colorado Prints Houses in 16 Days": Fire-Resistant Concrete Homes Built Layer by Layer While COBOD Robot Creates 1,100 Square Feet
How Two Homes Were 3D-Printed in Record Time and Showcase Colorado’s Fireproof Future
COBOD introduces a multifunctional construction robot for construction 3D printing
COBOD and TU Braunschweig Launch Multifunctional Construction Robot for Shotcrete 3D Printing
Multifunctional construction 3D printer integrates ‘Shotcrete’ capability
COBOD unveils first multifunctional construction robot
We Have Seen the Future of Construction Sites, and it Includes the CivDot Surveying Robot
Machine-readable surfaces
- Markdown mirror: /models/cobod-bod2.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/models/f04c5814-b03b-4765-9fc2-213170c56cfb
- Revision history: /models/cobod-bod2/history
- Data documentation: /data
- Query this programmatically: Deploy MCP
Reality vs attention
BOD2 draws attention at the 67th percentile but verifies reality at the 30th percentile among construction robots. Hype Gap +37.1, 6th widest among construction robots.
6-month trend
Analysis
Thin deployment record; scale validation still in progress.
Dimension breakdown
Verified signal
Attention (reach, not merit)
DEPLOY Intelligence scores are computed from verified registry data: confirmed deployments, disclosed funding rounds, regulatory filings, active job listings, video viewership, and press coverage. Confidence ratings reflect data availability. Scores update nightly.
DEPLOY Indices — verified vs claimed
Last computed: Nov 20, 2026