Robot model
Herrenknecht TBM
Herrenknecht tunnel boring machine for underground construction.
- Manufacturer
- Herrenknecht
- Form factor
- other
- Maturity
- commercial
- Lifecycle
- active
- Website
- herrenknecht.com ↗
Deploy Watch
Track Herrenknecht TBM on Deploy.
We notify you when a verified state change lands on the record, not when the company issues a claim.
Key facts
Mixshield and EPB (company-stated)
Rock and multi-mode TBMs (company-stated)
Data & sources
Web sources
1
1 source backing this record.View all →
Pricing
No verified price is on record for Herrenknecht TBM. Physical-AI systems are often sold through enterprise contracts or operated as a service rather than at a public list price.
Recent activity
Every change to this record is dated, sourced, and independently verified where marked.
- Record createdSep 6, 2026
Added to the verified registry
Safety record
No incidents on record for Herrenknecht TBM.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
Sources (1)
Common questions
What is Herrenknecht TBM?
How much does Herrenknecht TBM cost?
Is Herrenknecht TBM actually deployed in the real world?
Who makes Herrenknecht TBM?
Can you buy Herrenknecht TBM?
What are alternatives to Herrenknecht TBM?
How does Herrenknecht TBM compare to Archer Midnight?
Is Herrenknecht TBM a top other?
What is Herrenknecht TBM's maturity stage?
Where is Herrenknecht TBM deployed?
Is Herrenknecht TBM safe?
Methodology: Verified · 1 source (no primary) · last reviewed 2026-10-10
Verification posture
Verified
Low confidence
Review state
Stable
Last reviewed 2026-10-10
Maturity + lifecycle
Maturity stage: commercial
Lifecycle: active
Architectural position
Cohort: other
Sources by quality tier
- 1
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for Herrenknecht TBM.Recent coverage
Herrenknecht TBM in third-party press
Attention vs reality over time
Media mentions per month (area) against verified deployment events (dots). A press spike over a flat deployment line is the hype gap, drawn over time.
In the press
Recent coverage mentioning Herrenknecht TBM from third-party publications. Automatically surfaced; not part of the verified registry record.
Scarborough Subway Extension tunnelling progresses following maintenance stop
World record for longest single TBM drive broken on North York Moors mine project
First tunnel machine launched on polyhalite mine scheme
TBM assembly starts at Melbourne’s West Gate Tunnel
Tunnelling set to start on United Utilities West Cumbria scheme
Machine-readable surfaces
- Markdown mirror: /models/herrenknecht-tbm.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/models/c23fb3fd-3021-403f-aaf3-346c6cfc690f
- Revision history: /models/herrenknecht-tbm/history
- Data documentation: /data
- Query this programmatically: Deploy MCP
Reality vs attention
Herrenknecht TBM draws attention at the 38th percentile but verifies reality at the insufficient-data level among other robots.
6-month trend
Analysis
Thin deployment record; scale validation still in progress.
Signal flags
Dimension breakdown
Verified signal
Attention (reach, not merit)
DEPLOY Intelligence scores are computed from verified registry data: confirmed deployments, disclosed funding rounds, regulatory filings, active job listings, video viewership, and press coverage. Confidence ratings reflect data availability. Scores update nightly.
DEPLOY Indices — verified vs claimed
Last computed: Nov 4, 2026