DEPLOYDatabase

Data center campus

Stargate Norway Narvik

Stargate Norway Narvik is a tracked AI data center campus in Nordland, Narvik. JV between Nscale and Aker; hydro-powered. Announced 2026.

Announced · Stargate Infrastructure · Narvik, Nordland, Norway


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Stargate Norway Narvik capacity claims
Source

Key facts

announced

Lifecycle

0 GW

Energized

Norway

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
520 MW (initial 230 MW targeted end-2026 with option to expand to 520 MW)
Named tenants
OpenAI

On the data center map

Every tracked data center is on this map, centered on Stargate Norway Narvik. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

In clusterNordland(3)

The deal

Power

Power source
other
Interconnection

Why here

Stargate Norway Narvik is in Nordland, Narvik. It draws on other power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

Sources

037e12dd-1944-410f-92a4-81bc9c9b2130 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Stargate Norway Narvik?
Stargate Norway Narvik is an AI data center campus tracked on the DEPLOY registry, located in Narvik. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Stargate Norway Narvik?
Stargate Infrastructure is recorded as a party to Stargate Norway Narvik on the DEPLOY registry. The full party list, with each role, is on the record.
Is Stargate Norway Narvik operating yet?
As of the most recent verification on the DEPLOY registry, Stargate Norway Narvik is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Stargate Norway Narvik?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Stargate Norway Narvik on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Stargate Norway Narvik: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/stargate-infrastructure-stargate-norway-narvik

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces