Data center campus
Nscale Loughton AI Campus
Nscale Loughton AI Campus is a tracked AI data center campus in Essex, Loughton. nscale's first proprietary UK data center per Wikipedia, scheduled available Q1 2027. Listed on data-centers page.
Under construction · Nscale · Loughton, Essex, United Kingdom
Capacity: announced vs energized
| Source |
|---|
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- IT capacity (announced)
- 50 MW AI capacity, scalable to 90 MW (Nscale UK AI infrastructure announcement, Sep 16 2025)
- GPUs (announced)
- Approximately 23,000 NVIDIA GB300 GPUs from Q1 2027 to power Microsoft Azure services (Nscale; restated in Oct 15 2025 Microsoft deal)
- Anchor tenant
- Microsoft Azure (Nscale)
- Overlap HOLD
- Richer address-level row exists at nscale-loughton-essex (Langston Road). Merge of the two Loughton stubs held for Ben (same campus vs phase naming unclear without a primary site map).
On the data center map
Every tracked data center is on this map, centered on Nscale Loughton AI Campus. Pan or zoom out to see how close rivals are building.
In clusterEssex(3)
The deal
- developer
- Nscale
Power
- Power source
- grid
- Interconnection
Why here
Nscale Loughton AI Campus is in Essex, Loughton. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Sources
- Loughton — nscale facility
- Nscale announces UK AI infrastructure commitment
- Nscale Contracts ~200,000 NVIDIA GB300 GPUs with Microsoft
308baf4c-f91b-4d89-8e6f-3c91626ba4d8 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Nscale Loughton AI Campus?
Who is building Nscale Loughton AI Campus?
Is Nscale Loughton AI Campus operating yet?
How verified is the data on Nscale Loughton AI Campus?
Deploy Watch
Track Nscale Loughton AI Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Nscale Loughton AI Campus: AI data center campus record. Retrieved October 11, 2026, from https://registry.deploy.report/datacenters/nscale-loughton
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/nscale-loughton.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/nscale-loughton
- Data documentation: /data
- Query this programmatically: Deploy MCP