DEPLOYDatabase

Data center campus

Texas campus

Texas campus is a tracked AI data center campus in Naval Air Station Corpus Christi, Texas. Listed as an nscale-operated US site on the data-centers page. Specific city not disclosed on that page.

Energized · Nscale · Naval Air Station Corpus Christi, Texas


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Texas campus capacity claims
Source

Key facts

On the data center map

Every tracked data center is on this map, centered on Texas campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

developer
Nscale

Power

Interconnection

County water status: Severe drought (D2) in Nueces County, week of 2026-08-25 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Texas campus is in Naval Air Station Corpus Christi, Texas. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

5455c475-e688-4e47-b8a6-70b2a6f6c5aa · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Texas campus?
Texas campus is an AI data center campus tracked on the DEPLOY registry, located in Naval Air Station Corpus Christi, Texas. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Texas campus?
Nscale is recorded as a party to Texas campus on the DEPLOY registry. The full party list, with each role, is on the record.
Is Texas campus operating yet?
As of the most recent verification on the DEPLOY registry, Texas campus is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Texas campus?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Texas campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Texas campus: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/nscale-texas-campus

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces