Data center campus
Eco TIP West Data Center (Triangle Innovation Point West, Moncure)
Eco TIP West Data Center is an AI data center campus developed by Eco TIP West LLC in North Carolina. 0.75 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Announced · Eco TIP West LLC · Chatham County, North Carolina, North Carolina, United States
Capacity: announced vs energized
Announced-to-energized gap: 0.75 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.75 GW | 2026-09-29 | reported | journalist report |
Key facts
Lifecycle
Announced
Energized
Eco TIP West LLC
Developer
Location
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on Eco TIP West Data Center. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a county-level coordinate for this campus, not a verified site coordinate, so the marker shows the county rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
In clusterNorth Carolina(93)
The deal
- developer
- Eco TIP West LLC
Power
- Interconnection
County water status: Severe drought (D2) in Chatham County, week of 2026-11-24 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Eco TIP West Data Center is in North Carolina. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Nov 2026capacity changedannounced: unknown to 0.75
- Nov 2026Current: Announced
Sources
- Judge rules against Chatham County in Eco TIP data center fight · Chatham Journal
- Chatham County data center can proceed despite moratorium, judge rules · The News & Observer
- Judge orders North Carolina county to process permits for 750-megawatt data center · Triangle Business Journal
fddaab02-b43d-430c-bf4e-eeac7fcdc68a · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Common questions
What is Eco TIP West Data Center (Triangle Innovation Point West, Moncure)?
How much power will Eco TIP West Data Center (Triangle Innovation Point West, Moncure) use?
Who is building Eco TIP West Data Center (Triangle Innovation Point West, Moncure)?
Is Eco TIP West Data Center (Triangle Innovation Point West, Moncure) operating yet?
How verified is the data on Eco TIP West Data Center (Triangle Innovation Point West, Moncure)?
Deploy Watch
Track Eco TIP West Data Center (Triangle Innovation Point West, Moncure) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Eco TIP West Data Center (Triangle Innovation Point West, Moncure): AI data center campus record. Retrieved November 29, 2026, from https://registry.deploy.report/datacenters/eco-tip-west-moncure-data-center
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/eco-tip-west-moncure-data-center.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/eco-tip-west-moncure-data-center
- Data documentation: /data
- Query this programmatically: Deploy MCP