DEPLOYDatabase

Data center campus

Eco TIP West Data Center (Triangle Innovation Point West, Moncure)

Eco TIP West Data Center is an AI data center campus developed by Eco TIP West LLC in North Carolina. 0.75 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Announced · Eco TIP West LLC · Chatham County, North Carolina, North Carolina, United States


Capacity: announced vs energized

Announced-to-energized gap: 0.75 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Eco TIP West Data Center (Triangle Innovation Point West, Moncure) capacity claims
Source
Announced0.75 GW2026-09-29reportedjournalist report

Key facts

announced

Lifecycle

0.75 GW

Announced

0 GW

Energized

Eco TIP West LLC

Developer

0.75 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on Eco TIP West Data Center. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a county-level coordinate for this campus, not a verified site coordinate, so the marker shows the county rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.

In clusterNorth Carolina(93)

The deal

developer
Eco TIP West LLC

Power

Interconnection

County water status: Severe drought (D2) in Chatham County, week of 2026-11-24 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Eco TIP West Data Center is in North Carolina. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States

Timeline

  1. Nov 2026
    capacity changed
    announced: unknown to 0.75
  2. Nov 2026
    Current: Announced

Sources

fddaab02-b43d-430c-bf4e-eeac7fcdc68a · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Common questions

What is Eco TIP West Data Center (Triangle Innovation Point West, Moncure)?
Eco TIP West Data Center (Triangle Innovation Point West, Moncure) is an AI data center campus tracked on the DEPLOY registry, located in Chatham County, North Carolina. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Eco TIP West Data Center (Triangle Innovation Point West, Moncure) use?
Eco TIP West Data Center (Triangle Innovation Point West, Moncure) has 0.75 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building Eco TIP West Data Center (Triangle Innovation Point West, Moncure)?
Eco TIP West LLC is recorded as a party to Eco TIP West Data Center (Triangle Innovation Point West, Moncure) on the DEPLOY registry.
Is Eco TIP West Data Center (Triangle Innovation Point West, Moncure) operating yet?
As of the most recent verification on the DEPLOY registry, Eco TIP West Data Center (Triangle Innovation Point West, Moncure) is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Eco TIP West Data Center (Triangle Innovation Point West, Moncure)?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Eco TIP West Data Center (Triangle Innovation Point West, Moncure) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Eco TIP West Data Center (Triangle Innovation Point West, Moncure): AI data center campus record. Retrieved November 29, 2026, from https://registry.deploy.report/datacenters/eco-tip-west-moncure-data-center

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces