DEPLOYDatabase

Data center campus

Compass Meridian Campus

Compass Meridian Campus is a tracked AI data center campus in Mississippi, Lauderdale County.

Under construction · Compass Datacenters · Meridian, Lauderdale County, Mississippi, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Compass Meridian Campus capacity claims
Source

Construction evidence

Dated satellite imagery of the site itself, oldest to newest, with the campus milestones that landed in each window. This is what the site looked like from orbit while announcements, permits, and energizations were dated into our ledger, so bare land, grading, and building mass tell their own story alongside the paper trail. Sentinel-2 true color, 10 m resolution, cloud-free scenes; click any frame to expand it.

2018-05-13Contains modified Copernicus Sentinel data 2018
2020-05-02Contains modified Copernicus Sentinel data 2020
2022-09-14Contains modified Copernicus Sentinel data 2022
2024-09-08Contains modified Copernicus Sentinel data 2024
2025-09-18Contains modified Copernicus Sentinel data 2025

Dated Sentinel-2 imagery, gated to hand-verified site coordinates. Milestones synthesized from the campus's own capacity ledger, financial claims, and lifecycle events; each chip links to its source. How we source and verify it: satellite construction evidence.

Per-building manifest tied to the site polygons and imagery. When we know a building's outline we render it; when we know only its year and capacity we still surface those as first-class rows so the campus total is auditable, not a headline claim. Sorted largest-first; 1 on record.

Building 1
Building sqft: 504,226
polygon on record (7 vertices)

Manifest totals: 504,226 sqft. Rolled from the per-building rows above.

Key facts

0 GW

Energized

3

Facilities tracked

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
320 MW (320 MW at full build; broke ground 2025)

On the data center map

Every tracked data center is on this map, centered on Compass Meridian Campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

In clusterLauderdale County(5)·Mississippi(27)

The deal

Power

Power source
grid
Interconnection

County water status: Abnormally dry (D0) in Lauderdale County, week of 2026-09-15 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Compass Meridian Campus is in Mississippi, Lauderdale County. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States
FAA Proposed Rule: Enabling Supersonic Overland Flight (July 2026)operational restriction · 2026-07-02 · United States

Facilities at this campus

Sources

ca2af182-3bc8-46a6-b080-4921308f0091 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Compass Meridian Campus?
Compass Meridian Campus is an AI data center campus tracked on the DEPLOY registry, located in Meridian. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Compass Meridian Campus?
Compass Datacenters is recorded as a party to Compass Meridian Campus on the DEPLOY registry. The full party list, with each role, is on the record.
Is Compass Meridian Campus operating yet?
As of the most recent verification on the DEPLOY registry, Compass Meridian Campus is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Compass Meridian Campus?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Compass Meridian Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Compass Meridian Campus: AI data center campus record. Retrieved September 20, 2026, from https://registry.deploy.report/datacenters/compass-datacenters-compass-meridian-campus

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces