Fluidstack Wythe County Campus (Progress Park)

Fluidstack Wythe County Campus is a tracked AI data center campus in Virginia, Wythe. Fluidstack is building a computing campus on 99 acres in Progress Park, Wythe County, Virginia. The company says most construction should be complete by the end of 2027, with operations beginning in phases.

Under construction · Fluidstack · Wythe, Virginia, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Fluidstack Wythe County Campus (Progress Park) capacity claims
Source

Key facts

0 GW

Energized

Fluidstack

Developer

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Jobs (company-claimed)
About 1,000 construction jobs at peak and 75 full-time jobs once operational.
Power costs (company-claimed)
Fluidstack says it will pay for its electricity, needed infrastructure and upgrades to the nearby substation.

On the data center map

No mappable coordinate is recorded for Fluidstack Wythe County Campus (Progress Park) yet. Location: Wythe.

In clusterVirginia(342)

The deal

developer
Fluidstack
utility
APCO

Why here

Fluidstack Wythe County Campus is in Virginia, Wythe. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States

Timeline

  1. Nov 2026
    party added
    utility: APCO
  2. Nov 2026
    Current: Under construction

Sources

f09a7429-2b67-45bb-8e2c-929880f4ac8f · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Fluidstack Wythe County Campus (Progress Park)?
Fluidstack Wythe County Campus (Progress Park) is an AI data center campus tracked on the DEPLOY registry, located in Wythe. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Fluidstack Wythe County Campus (Progress Park)?
Fluidstack is recorded as a party to Fluidstack Wythe County Campus (Progress Park) on the DEPLOY registry. The full party list, with each role, is on the record.
Is Fluidstack Wythe County Campus (Progress Park) operating yet?
As of the most recent verification on the DEPLOY registry, Fluidstack Wythe County Campus (Progress Park) is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Fluidstack Wythe County Campus (Progress Park)?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Fluidstack Wythe County Campus (Progress Park) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Fluidstack Wythe County Campus (Progress Park): AI data center campus record. Retrieved November 11, 2026, from https://registry.deploy.report/datacenters/fluidstack-wythe-county-progress-park

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces