DEPLOYDatabase

Data center campus

RunPod US-OR-1 (Oregon)

RunPod US-OR-1 is a tracked AI data center campus in Portland, Oregon, USA. Secure Cloud region operated by RunPod as listed in their data center catalog. Underlying colocation partner not disclosed.

Energized · RunPod · Portland, Oregon, USA


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
RunPod US-OR-1 (Oregon) capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

RunPod

Developer

On the data center map

Every tracked data center is on this map, centered on RunPod US-OR-1. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

developer
RunPod

Power

Power source
grid
Interconnection

County water status: Moderate drought (D1) in Multnomah County, week of 2026-08-25 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

RunPod US-OR-1 is in Portland, Oregon, USA. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

16ff9eb0-f12a-40b3-94cd-996c70bd3884 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is RunPod US-OR-1 (Oregon)?
RunPod US-OR-1 (Oregon) is an AI data center campus tracked on the DEPLOY registry, located in Portland, Oregon, USA. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building RunPod US-OR-1 (Oregon)?
RunPod is recorded as a party to RunPod US-OR-1 (Oregon) on the DEPLOY registry. The full party list, with each role, is on the record.
Is RunPod US-OR-1 (Oregon) operating yet?
As of the most recent verification on the DEPLOY registry, RunPod US-OR-1 (Oregon) is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on RunPod US-OR-1 (Oregon)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track RunPod US-OR-1 (Oregon) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). RunPod US-OR-1 (Oregon): AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/runpod-us-or-1

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces