xAI Colossus is an announced AI data center campus. 2 GW of capacity has been announced; 1 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Partially energized · Former industrial site · Memphis, Tennessee, United States


Capacity: announced vs energized

Announced
2 GW
claimed
Contracted
not recorded
Under construction
not recorded
Energized
1 GW
reported

Announced-to-energized gap: 1 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

xAI Colossus (Memphis) capacity claims
Source
Announced2 GW2026-01-15claimedpress release
Energized1 GW2026-06-30reportedjournalist report

The deal

developer
xAI · Owner and operator.
chip supplier
Nvidia · 555,000 Nvidia GPUs at full 2 GW.
utility
Solaris Energy Infrastructure · On-site gas turbine fleet powering the campus behind the meter.

Power

Power source
behind the meter gas
Interconnection

Solaris on-site gas turbines, 1.10 GW gas, Under construction. About 400 MW currently serving xAI; Solaris expects over 1.1 GW operating for xAI by Q2 2027.

Financial structure

Reported buildout cost
$18B journalist report

Sources