Data center campus
xAI Colossus 2 Data Center
xAI Colossus 2 Data Center is an AI data center campus developed by xAI in Mississippi, Southaven. 1.20 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Partially energized · xAI · Southaven, Mississippi, United States
Capacity: announced vs energized
Announced-to-energized gap: 1.20 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2026. 4 months away. Claimed by xAI (reported) (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 1.20 GW | 2026-06-01 | reported | journalist report |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on xAI Colossus 2 Data Center. Pan or zoom out to see how close rivals are building.
The deal
Power
- Power source
- behind the meter gas
- Interconnection
Colossus 2 on-site gas turbine fleet, 0.49 GW gas, Partially energized. ~46 turbines (~495 MW) reported operating; 41 additional turbines permitted March 2026
County water status: No drought in DeSoto County, week of 2026-08-11 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
xAI Colossus 2 Data Center is in Mississippi, Southaven. It draws on behind the meter gas power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- Reported multi-billion investment (largest private-sector in state history)
- Aggregate figures vary across reports journalist report
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
Timeline
- Aug 2026party addedoperator: d7bc30aa-e892-42f7-a58a-e172534fec48
- Aug 2026Current: Partially energized
Sources
- DCD: xAI deploys gas turbines at Colossus 2, Southaven
- Wikipedia: Colossus (data center)
- Global Energy Monitor: Colossus 2 power station
- SELC: xAI gas turbines and air permits
1135eddf-79b2-4cde-aa07-753c2624341f · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is xAI Colossus 2 Data Center?
How much power will xAI Colossus 2 Data Center use?
Who is building xAI Colossus 2 Data Center?
Is xAI Colossus 2 Data Center operating yet?
How verified is the data on xAI Colossus 2 Data Center?
Deploy Watch
Track xAI Colossus 2 Data Center on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). xAI Colossus 2 Data Center: AI data center campus record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/xai-colossus-2-southaven-mississippi
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/xai-colossus-2-southaven-mississippi.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/xai-colossus-2-southaven-mississippi
- Data documentation: /data
- Query this programmatically: Deploy MCP