Data center campus
xAI Colossus 2 Data Center
xAI Colossus 2 Data Center is an AI data center campus developed by xAI in Mississippi, Southaven. 1.20 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Partially energized · xAI · Southaven, Mississippi, United States
Capacity: announced vs energized
Announced-to-energized gap: 1.20 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2026. 1 month away. Claimed by xAI (reported) (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 1.20 GW | 2026-06-01 | reported | journalist report |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Facilities tracked
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Operator
- xAI
- Primary workload
- Grok training; expansion of the Memphis-area Colossus complex
- Announced capacity
- About 1.2 GW; about 2 GW with Colossus 1
- Lifecycle
- Partially energized (2026)
- On-site gas turbines (reported)
- 46 turbines (about 495 MW) ran without air permits; 41 more permitted Mar 2026
- Cooling water (reported, early 2026)
- Drinking water, about 1.3M gallons a day
- Water recycling plant (sources differ)
- Earlier reports: about $80M, 13M gal/day; company (Sep 2026): $360M, 10M gal/day.
- State investment (reported)
- Largest private investment in Mississippi history
- Regulatory scrutiny
- SELC and state regulators flagged unpermitted gas turbines
- GPU mix (company-claimed, Sep 2026)
- Musk: 110k GB200 and 440k GB300, with more GB300 batches planned through Dec 2026.
- Battery storage (company-claimed, Sep 2026)
- 3.3 GWh grid-connected battery
- Regional impact (company-claimed, Sep 2026)
- $90B+ regional investment; $60M+ 2026 tax revenue; 7,500 jobs supported
- Memphis substations (company-claimed, Sep 2026)
- $35M for a 150 MW substation and $20M for a second, at no cost to MLGW
- Turbine removal (company-claimed, Sep 2026)
- State agreed order requires temporary turbines removed by Jul 2027
- Campus scale (company-claimed, Sep 2026)
- Over 2 GW of compute; 1M+ GPUs planned
- Gun Range cluster (company-claimed, Oct 2026)
- Musk said Oct 31 that Gun Range will hold about 220k GB300s configured for training, like Macroharder and Minihard, and is tracking to be operational by end of November 2026.
- Spam cluster (company-claimed, Oct 2026)
- Musk said Spam, a building that once housed Hormel products, will hold about 200k GB300s set up for inference with simpler networking and under half the fiber, due in December 2026.
- Year-end Blackwell total (company-claimed, Oct 2026)
- Musk said Colossus 2 will have around 1.2M Blackwell GPUs in total by the end of 2026.
On the data center map
Every tracked data center is on this map, centered on xAI Colossus 2 Data Center. Pan or zoom out to see how close rivals are building.
- Announced capex
- $80M
- Cost per MW
- $67K/MW
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterMississippi(27)
The deal
Power
- Power source
- behind the meter gas
- Interconnection
- Water
- Sits too far from the wastewater plant and draws millions of gallons/day of drinking water (about 1.3M gal/day as of early 2026); xAI has announced an ~$80M treatment plant to reuse ~13M gal/day of wastewater. Powered by on-site natural gas turbines.
Colossus 2 on-site gas turbine fleet, 0.49 GW gas, Partially energized. ~46 turbines (~495 MW) reported operating; 41 additional turbines permitted March 2026
County water status: Severe drought (D2) in DeSoto County, week of 2026-11-10 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Silicon on site
Every AI chip publicly attributed to xAI Colossus 2 Data Center on the DEPLOY registry. Quantity hints are unstructured because underlying disclosures vary by an order of magnitude. Source links per row.
- as of 2026-06-01
Blackwell generation for Colossus 2 expansion
reported
Why here
xAI Colossus 2 Data Center is in Mississippi, Southaven. It draws on behind the meter gas power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- Reported multi-billion investment (largest private-sector in state history)
- Aggregate figures vary across reports journalist report
- Planned wastewater treatment plant (Colossus 2)
- $80M press
Regulatory paper trail
The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document. 3 permits on file with MDEQ: 2 air permits, 1 wastewater permit (1 pending).
Investment, workforce and specs
Facilities at this campus
- xAI Southaven Data Center (MACROHARD)hyperscale
Setbacks
Timeline
- Nov 2026permit recordedPretreatment permit (industrial discharge to POTW) MSP092491 recorded from https://opc.deq.state.ms.us/ai_info.aspx?ai=12592
- Nov 2026Current: Partially energized
Sources
- DCD: xAI deploys gas turbines at Colossus 2, Southaven
- Wikipedia: Colossus (data center)
- Global Energy Monitor: Colossus 2 power station
- SELC: xAI gas turbines and air permits
- Wastewater Will Cool This Memphis Data Center · Governing
- Elon Musk: Colossus 1/2 GPU inventory and Q4 GB300 ramp · X (@elonmusk)
- Sawyer Merritt: amplifying Musk Colossus inventory post · X (@SawyerMerritt)
- SpaceX Mid-South (Colossus community / investment page) · SpaceX (official)
- Sawyer Merritt: SpaceX Mid-South site claims (battery pack, water, substations, turbines) · X (@SawyerMerritt)
- Memphis Local Impact Report (SpaceX Mid-South) · SpaceX (official PDF)
- Southaven Local Impact Report (SpaceX Mid-South) · SpaceX (official PDF)
- Musk: Gun Range training and Spam inference clusters at Colossus 2 · Elon Musk on X
- Musk: around 1.2M Blackwells at Colossus 2 by end of year · Elon Musk on X
- Musk: Gun Range was the local police department gun range · Elon Musk on X
- SpaceX's Next AI Supercomputers Are Called Gun Range and Spam · TeslaNorth
1135eddf-79b2-4cde-aa07-753c2624341f · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is xAI Colossus 2 Data Center?
How much power will xAI Colossus 2 Data Center use?
Who is building xAI Colossus 2 Data Center?
Is xAI Colossus 2 Data Center operating yet?
How verified is the data on xAI Colossus 2 Data Center?
Deploy Watch
Track xAI Colossus 2 Data Center on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). xAI Colossus 2 Data Center: AI data center campus record. Retrieved November 20, 2026, from https://registry.deploy.report/datacenters/xai-colossus-2-southaven-mississippi
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/xai-colossus-2-southaven-mississippi.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/xai-colossus-2-southaven-mississippi
- Data documentation: /data
- Query this programmatically: Deploy MCP