xAI Colossus 2 Data Center is an AI data center campus developed by xAI in Mississippi, Southaven. 1.20 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Partially energized · xAI · Southaven, Mississippi, United States


Capacity: announced vs energized

Announced-to-energized gap: 1.20 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Promised online: 2026. 1 month away. Claimed by xAI (reported) (source).

xAI Colossus 2 Data Center capacity claims
Source
Announced1.20 GW2026-06-01reportedjournalist report

Key facts

1.20 GW

Announced

0 GW

Energized

xAI

Developer

1

Facilities tracked

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Operator
xAI
Primary workload
Grok training; expansion of the Memphis-area Colossus complex
Announced capacity
About 1.2 GW; about 2 GW with Colossus 1
Lifecycle
Partially energized (2026)
On-site gas turbines (reported)
46 turbines (about 495 MW) ran without air permits; 41 more permitted Mar 2026
Cooling water (reported, early 2026)
Drinking water, about 1.3M gallons a day
Water recycling plant (sources differ)
Earlier reports: about $80M, 13M gal/day; company (Sep 2026): $360M, 10M gal/day.
State investment (reported)
Largest private investment in Mississippi history
Regulatory scrutiny
SELC and state regulators flagged unpermitted gas turbines
GPU mix (company-claimed, Sep 2026)
Musk: 110k GB200 and 440k GB300, with more GB300 batches planned through Dec 2026.
Battery storage (company-claimed, Sep 2026)
3.3 GWh grid-connected battery
Regional impact (company-claimed, Sep 2026)
$90B+ regional investment; $60M+ 2026 tax revenue; 7,500 jobs supported
Memphis substations (company-claimed, Sep 2026)
$35M for a 150 MW substation and $20M for a second, at no cost to MLGW
Turbine removal (company-claimed, Sep 2026)
State agreed order requires temporary turbines removed by Jul 2027
Campus scale (company-claimed, Sep 2026)
Over 2 GW of compute; 1M+ GPUs planned
Gun Range cluster (company-claimed, Oct 2026)
Musk said Oct 31 that Gun Range will hold about 220k GB300s configured for training, like Macroharder and Minihard, and is tracking to be operational by end of November 2026.
Spam cluster (company-claimed, Oct 2026)
Musk said Spam, a building that once housed Hormel products, will hold about 200k GB300s set up for inference with simpler networking and under half the fiber, due in December 2026.
Year-end Blackwell total (company-claimed, Oct 2026)
Musk said Colossus 2 will have around 1.2M Blackwell GPUs in total by the end of 2026.

On the data center map

Every tracked data center is on this map, centered on xAI Colossus 2 Data Center. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.
The story of xAI Colossus 2 Data Center
Announced capex
$80M
Derived
Cost per MW
$67K/MW

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterMississippi(27)

The deal

developer
xAI · Owner and operator of Colossus supercomputer campuses
operator
xAI

Power

Power source
behind the meter gas
Interconnection
Water
Sits too far from the wastewater plant and draws millions of gallons/day of drinking water (about 1.3M gal/day as of early 2026); xAI has announced an ~$80M treatment plant to reuse ~13M gal/day of wastewater. Powered by on-site natural gas turbines.

Colossus 2 on-site gas turbine fleet, 0.49 GW gas, Partially energized. ~46 turbines (~495 MW) reported operating; 41 additional turbines permitted March 2026

County water status: Severe drought (D2) in DeSoto County, week of 2026-11-10 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Silicon on site

Every AI chip publicly attributed to xAI Colossus 2 Data Center on the DEPLOY registry. Quantity hints are unstructured because underlying disclosures vary by an order of magnitude. Source links per row.

  1. Blackwell generation for Colossus 2 expansion

    reported

    SemiAnalysis

Why here

xAI Colossus 2 Data Center is in Mississippi, Southaven. It draws on behind the meter gas power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Reported multi-billion investment (largest private-sector in state history)
Aggregate figures vary across reports journalist report
Planned wastewater treatment plant (Colossus 2)
$80M press

Regulatory paper trail

The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document. 3 permits on file with MDEQ: 2 air permits, 1 wastewater permit (1 pending).

Air construction permit, PSD (41 natural gas turbines) 0680-00119Decided 2026-03-11 · docket AI 12592 · MZX Tech LLCMDEQ · In effect
Air general permit coverage (construction modification) MSR109658Decided 2025-10-10 · docket AI 12592 · MZX Tech LLCMDEQ · Inactive

Investment, workforce and specs

Facilities at this campus

Setbacks

Timeline

  1. Nov 2026
    permit recorded
    Pretreatment permit (industrial discharge to POTW) MSP092491 recorded from https://opc.deq.state.ms.us/ai_info.aspx?ai=12592
  2. Nov 2026
    Current: Partially energized

Sources

1135eddf-79b2-4cde-aa07-753c2624341f · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is xAI Colossus 2 Data Center?
xAI Colossus 2 Data Center is an AI data center campus tracked on the DEPLOY registry, located in Southaven. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will xAI Colossus 2 Data Center use?
xAI Colossus 2 Data Center has 1.20 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building xAI Colossus 2 Data Center?
xAI is recorded as a party to xAI Colossus 2 Data Center on the DEPLOY registry. The full party list, with each role, is on the record.
Is xAI Colossus 2 Data Center operating yet?
As of the most recent verification on the DEPLOY registry, xAI Colossus 2 Data Center is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on xAI Colossus 2 Data Center?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track xAI Colossus 2 Data Center on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). xAI Colossus 2 Data Center: AI data center campus record. Retrieved November 20, 2026, from https://registry.deploy.report/datacenters/xai-colossus-2-southaven-mississippi

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces