DEPLOYDatabase

Data center campus

Cirrascale US-West region (San Diego / HQ operations)

Cirrascale US-West region is a tracked AI data center campus in San Diego, California, USA. Cirrascale HQ and original bare-metal cloud footprint. Company's about page groups facilities under US-West/US-East/US-South buckets without publishing per-site city detail or MW capacity.

Energized · Cirrascale Cloud Services · San Diego, California, USA


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Cirrascale US-West region (San Diego / HQ operations) capacity claims
Source

Key facts

On the data center map

Every tracked data center is on this map, centered on Cirrascale US-West region. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

Power

Power source
grid
Interconnection

County water status: Abnormally dry (D0) in San Diego County, week of 2026-08-25 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Cirrascale US-West region is in San Diego, California, USA. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

36b74c57-db0b-4814-b86f-038ca9eaa6ef · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Cirrascale US-West region (San Diego / HQ operations)?
Cirrascale US-West region (San Diego / HQ operations) is an AI data center campus tracked on the DEPLOY registry, located in San Diego, California, USA. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Cirrascale US-West region (San Diego / HQ operations)?
Cirrascale Cloud Services is recorded as a party to Cirrascale US-West region (San Diego / HQ operations) on the DEPLOY registry. The full party list, with each role, is on the record.
Is Cirrascale US-West region (San Diego / HQ operations) operating yet?
As of the most recent verification on the DEPLOY registry, Cirrascale US-West region (San Diego / HQ operations) is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Cirrascale US-West region (San Diego / HQ operations)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Cirrascale US-West region (San Diego / HQ operations) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Cirrascale US-West region (San Diego / HQ operations): AI data center campus record. Retrieved August 30, 2026, from https://registry.deploy.report/datacenters/cirrascale-us-west-region

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces