DEPLOYDatabase

Data center campus

Helios

Helios is a tracked AI data center campus in Texas, Abilene. West Texas campus per Baxtel

Under construction · CoreWeave · Abilene, Texas, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Helios capacity claims
Source

Key facts

0 GW

Energized

CoreWeave

Developer

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Named tenants
CoreWeave

On the data center map

Every tracked data center is on this map, centered on Helios. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

In clusterTexas(606)

The deal

developer
CoreWeave

Power

Power source
grid
Interconnection

County water status: Moderate drought (D1) in Taylor County, week of 2026-08-25 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Helios is in Texas, Abilene. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States

Sources

dba3fa5a-a711-494d-bdb3-6f56c70aeea9 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Helios?
Helios is an AI data center campus tracked on the DEPLOY registry, located in Abilene. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Helios?
CoreWeave is recorded as a party to Helios on the DEPLOY registry. The full party list, with each role, is on the record.
Is Helios operating yet?
As of the most recent verification on the DEPLOY registry, Helios is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Helios?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Helios on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Helios: AI data center campus record. Retrieved August 29, 2026, from https://registry.deploy.report/datacenters/coreweave-helios

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces