Gainesville Crossing Data Center Campus is a tracked AI data center campus in Virginia, Gainesville. Blue Owl Digital Infrastructure Trust acquired a 54-megawatt, 363,220-square-foot data center at 3720 University Boulevard on this campus for $779.5 million, per Commercial Observer. The facility is fully leased to a sin

Announced · Blue Owl Digital Infrastructure Trust · Gainesville, Virginia, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Gainesville Crossing Data Center Campus capacity claims
Source

Key facts

announced

Lifecycle

0 GW

Energized

Blue Owl Digital Infrastructure Trust

Developer

On the data center map

Every tracked data center is on this map, centered on Gainesville Crossing Data Center Campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

In clusterVirginia(344)

The deal

investor
Blue Owl Digital Infrastructure Trust

Power

Interconnection

County water status: Moderate drought (D1) in Prince William County, week of 2026-11-17 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Gainesville Crossing Data Center Campus is in Virginia, Gainesville. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States

Timeline

  1. Nov 2026
    party added
    investor: Blue Owl Digital Infrastructure Trust
  2. Nov 2026
    Current: Announced

Sources

4cb122bc-1f5c-40f4-bf8b-06f8d549293c · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Gainesville Crossing Data Center Campus?
Gainesville Crossing Data Center Campus is an AI data center campus tracked on the DEPLOY registry, located in Gainesville. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Gainesville Crossing Data Center Campus?
Blue Owl Digital Infrastructure Trust is recorded as a party to Gainesville Crossing Data Center Campus on the DEPLOY registry.
Is Gainesville Crossing Data Center Campus operating yet?
As of the most recent verification on the DEPLOY registry, Gainesville Crossing Data Center Campus is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Gainesville Crossing Data Center Campus?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Gainesville Crossing Data Center Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Gainesville Crossing Data Center Campus: AI data center campus record. Retrieved November 21, 2026, from https://registry.deploy.report/datacenters/gainesville-crossing-data-center-campus

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces