Data center campus
Stargate Abilene
Stargate Abilene is a tracked AI data center campus in Texas, Abilene. Flagship Stargate site. Developed by Crusoe, leased to Oracle, subleased to OpenAI. First Stargate Project site.
Partially energized · Stargate Infrastructure · Crusoe-owned campus on Lancium land · ERCOT · Abilene, Texas, United States
Capacity: announced vs energized
| Source |
|---|
Key facts
Lifecycle
Energized
Developer
Location
Grid
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
On the data center map
Every tracked data center is on this map, centered on Stargate Abilene. Pan or zoom out to see how close rivals are building.
In clusterTexas(606)
The deal
- developer
- Stargate Infrastructure
Power
- Power source
- behind the meter gas
- Grid operator
- ERCOT
- Interconnection
The Texas (ERCOT) grid demand right now: 63.1 GW (EIA-930, 2026-08-29 15:00).
County water status: Moderate drought (D1) in Taylor County, week of 2026-08-25 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Stargate Abilene sits on crusoe-owned campus on lancium land in Texas, Abilene. It connects to the ERCOT grid, draws on behind the meter gas power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Sources
b1ffd122-914f-488b-bb69-dfdbe7f9f806 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Stargate Abilene?
Who is building Stargate Abilene?
Is Stargate Abilene operating yet?
How verified is the data on Stargate Abilene?
Deploy Watch
Track Stargate Abilene on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Stargate Abilene: AI data center campus record. Retrieved August 29, 2026, from https://registry.deploy.report/datacenters/stargate-infrastructure-stargate-abilene
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/stargate-infrastructure-stargate-abilene.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/stargate-infrastructure-stargate-abilene
- Data documentation: /data
- Query this programmatically: Deploy MCP