Data center campus
Stargate Shackelford County
Stargate Shackelford County is a tracked AI data center campus in Texas, Albany (Shackelford County). Announced July 2025.
Announced · Stargate Infrastructure · ERCOT · Albany (Shackelford County), Texas, United States
Capacity: announced vs energized
| Source |
|---|
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- IT capacity
- part of five-site expansion; individual capacity not disclosed
- Named tenants
- OpenAI
- Grid operator
- ERCOT
On the data center map
Every tracked data center is on this map, centered on Stargate Shackelford County. Pan or zoom out to see how close rivals are building.
In clusterTexas(606)
The deal
- developer
- Stargate Infrastructure
Power
- Power source
- mixed
- Grid operator
- ERCOT
- Interconnection
The Texas (ERCOT) grid demand right now: 63.1 GW (EIA-930, 2026-08-29 15:00).
County water status: Moderate drought (D1) in Shackelford County, week of 2026-08-25 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Stargate Shackelford County is in Texas, Albany (Shackelford County). It connects to the ERCOT grid, draws on mixed power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Sources
e595ebdd-f98f-4ea5-8c4b-647cbcb7ea1f · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Stargate Shackelford County?
Who is building Stargate Shackelford County?
Is Stargate Shackelford County operating yet?
How verified is the data on Stargate Shackelford County?
Deploy Watch
Track Stargate Shackelford County on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Stargate Shackelford County: AI data center campus record. Retrieved August 29, 2026, from https://registry.deploy.report/datacenters/stargate-infrastructure-stargate-shackelford-county
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/stargate-infrastructure-stargate-shackelford-county.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/stargate-infrastructure-stargate-shackelford-county
- Data documentation: /data
- Query this programmatically: Deploy MCP