Crusoe

Crusoe started in 2018 as a stranded-energy play, running Bitcoin miners on flare gas at oil wellheads in the Bakken and Permian, then pivoted hard into AI…

HQ
Undisclosed
Status
private

The verified answer

As of Oct 2026, DEPLOY verifies Crusoe: $2.5B raised. 16 sources back the record.

Funding

$2.5B

Employees

700

Overview

Crusoe started in 2018 as a stranded-energy play, running Bitcoin miners on flare gas at oil wellheads in the Bakken and Permian, then pivoted hard into AI compute as the training market took off. In early 2025 it divested the Bitcoin mining business to NYDIG and rebranded around a single thesis: an "energy-first AI factory company" that builds and operates its own campuses rather than reselling colocation. The result is a vertically integrated stack, from power procurement and site development through data center construction to a managed GPU cloud and, most recently, a serverless fine-tuning and inference layer called Crusoe Intelligence Foundry.

The company's flagship site is the Abilene, Texas campus, originally announced as the anchor build for the Oracle-led Stargate project supporting OpenAI training workloads, and now serving Microsoft AI capacity as well. Crusoe says its contracted AI infrastructure pipeline is approaching five gigawatts across sites including Abilene, a newly announced 1.0 GW campus in Childress with Lancium, and international expansion in Iceland (via atNorth), Norway (Polar) and Argentina. Announced power deals with Bergen Engines, ON.energy, Form Energy and a nuclear partnership with Aalo Atomics signal a strategy of locking in low-cost, purpose-built energy well ahead of GPU delivery.

Compared with the rest of the neocloud pack, Crusoe is distinctive on two axes: it is a builder-operator, not primarily a lessor of hyperscale colocation, and its go-to-market spans both hyperscaler-scale anchor tenants (Microsoft, and via Stargate the OpenAI workload) and a long tail of AI-native startups (Cursor, Fireworks, Together AI, Modal, Baseten, Luma, HeyGen, Figure, Cognition). That mix places it in the same conversation as CoreWeave and Lambda for training capacity, while its energy-development posture more closely resembles Crusoe's own Bitcoin-era competitors and traditional data center developers than pure GPU-cloud peers.

Reality check

Total contracted value (claimed)

$140B+ TCV across platform (company-claimed in Series F PR; unaudited)

Managed Inference contracted ARR (company-claimed Sep 2026)

Company (Crusoe, Sep 23 2026): Thinking Machines Lab deal takes Crusoe Managed Inference past $100 million in contracted ARR less than a year from launch. Company-claimed contracted ARR; not audited revenue

Verified record

Verified deployments
None on file
Active incidents
None on file

Key facts

Headquarters

Undisclosed

Status

private

Type

brain

Positioning

Energy-first AI factory company: vertically integrated from power procurement and site development through GPU cloud and Intelligence Foundry inference/fine-tuning services

Contracted AI infrastructure capacity

6GW+ gross contracted capacity across data centers and cloud, including 1 GW delivered and operational (company-claimed in Series F PR, Sep 2026). Prior mid-2026 figure was ~4.9–5 GW.

Flagship campus

Abilene, Texas, 900+ MW AI factory anchor site; originally the Stargate/OpenAI training buildout, now also supporting Microsoft AI capacity

Announced expansion

1.0 GW campus in Childress, Texas with Lancium (July 2026); European sites in Iceland (atNorth) and Norway (Polar); Argentina expansion

GPU inventory

NVIDIA GB200 NVL72, B200, H200, H100 plus AMD MI355X and MI300X; company does not publish an aggregate GPU count

Silicon partnerships

Expanded NVIDIA collaboration announced March 2026; AMD MI300X/MI355X production instances offered on the cloud

Named customers

Microsoft (via Abilene anchor); AI-native tenants including Cursor, Fireworks, Together AI, Modal, Baseten, Luma, HeyGen, Figure, Cognition, Roboflow, Cartesia, Covariant, Jasper

Latest funding round

Series F initial close of $3.9B at $30.9B post-money valuation (announced Sep 17 2026). Co-led by Atreides Management, Mubadala Capital, and Valor Equity Partners. Note: $3.9B is the raise amount, not the valuation.

Public/private status

Private

Notable restructuring

Sold Bitcoin mining business to NYDIG in early 2025 to focus exclusively on AI infrastructure

Energy partnerships

Announced deals in 2026: 750 MW gas power with Bergen Engines; 5 GW of AI UPS with ON.energy; 12 GWh iron-air storage with Form Energy; nuclear partnership with Aalo Atomics; recycling partnership with Redwood Materials

European HQ

Dublin, Ireland (opened February 2025)

Product surface

Crusoe Intelligence Foundry (managed fine-tuning + serverless inference, GA July 2026), Crusoe Cloud (bare-metal and managed GPU instances), Crusoe data center development

Positioning axis

Both training (hyperscaler anchor tenants at gigawatt sites) and inference (Foundry serverless), spanning hyperscale anchors and AI-native long tail

Power capacity (planned)

4,900 MW contracted (Jun 2026); >40 GW pipeline

Primary accelerator

NVIDIA GB200 / B200 / H200 + AMD MI300X

Latest valuation

$30.9B post-money at Series F initial close (Sep 17 2026, company/Reuters)

ClusterMAX 3.0 Bronze (Sep 2026)

Crusoe drops to Bronze in SemiAnalysis ClusterMAX 3.0 (executive summary). SemiAnalysis ClusterMAX 3.0 (Sep 23 2026): covers 77 managed GPU clouds in depth; raised the bar so only 19 providers hit a Medallion rating (Platinum/Gold/Silver/Bronze). Analyst ranking from hands-on cluster testing; not a company press release

Project Llano Claude TX (Google campus, Sep 2026)

Reported Sep 23 2026 (KFDA NewsChannel 10): Crusoe and Google Project Llano / Goodnight Campus in Claude, Armstrong County, TX is a six-building campus under construction; first handoff to Google expected early 2027; closed-loop cooling; primary power Goodnight 1/2 wind (ERCOT backup); Google committed to 50 permanent jobs. Also covered earlier by Data Center Dynamics (GN DC1 LLC filings). Local TV open house + trade press

Thinking Machines Lab Managed Inference (~$65M/yr, Sep 2026)

Company (Crusoe newsroom + GlobeNewswire, Sep 23 2026): $65 million annual agreement for Thinking Machines Lab open-model inference on Crusoe Managed Inference. Dedicated Tailored Deployment of NVIDIA HGX B200 systems with NVIDIA Quantum-2 InfiniBand; workloads cited include Inkling models, GLM 5.2/5.3, and fine-tuned variants. Company press; commercial terms otherwise undisclosed

Boom Superpower launch partnership ended (Sep 2026)

Reported (reported; also Blake Scholl X): on Sep 25 2026 Boom CEO Blake Scholl said Crusoe and Boom are no longer moving forward with the Superpower turbine launch partnership; turbines are no longer part of Crusoe near-term primary power mix at Abilene and similar sites. Crusoe confirmed to TechCrunch (Andrew Schmitt) that the partnership is not the right fit today, while noting it may still use turbines with wind/solar/batteries/grid as sites evolve. Cap: TechCrunch reporting + CEO X + Crusoe confirmation; not a joint press release

Prior Boom Superpower order (reported Sep 2026)

Reported (reported): TechCrunch says Crusoe had been Boom's first Superpower customer under a prior plan to spend $1.25B on 29 of Boom's 42-MW Superpower turbines (~1.2 GW), with first deliveries expected in 2027. That launch deal has fallen apart. Cap: deal terms attributed by TechCrunch; Scholl confirms the breakup and Boom forward plan, not every historical term line-by-line in the X post

Crusoe developer of Google Armstrong County campus (company-stated, Sep 2026)

Company-stated (company-stated; also DCD): on Sep 28 2026 Crusoe announced it is the developer of Google's data center campus under construction in Armstrong County outside Amarillo (Claude, TX / Project Llano / Goodnight Campus). Chase Lochmiller framed an energy-first strategy: build AI factories at the source of abundant low-cost energy. Campus has a direct connection to Serena's adjacent Goodnight 1 (265.5 MW, operational) and Goodnight 2 (265.5 MW, under construction; catalyzed by Crusoe's site development); surplus wind returns to the grid. Closed-loop, non-evaporative liquid cooling to limit water footprint primarily to domestic uses. Broke ground June 2025; more than 5,500 skilled laborers on-site daily. Part of Crusoe's West Texas portfolio with two Abilene campuses. Cap: company newsroom + trade press; campus MW demand / total capex not disclosed in this release. Distinct from earlier Sep 23 KFDA open-house reported keyFact on the same campus

Data & sources

News coverage

2

Web sources

14

16 sources backing this record.View all →

Partnerships

Every company Crusoe has built with, alongside the ones only announced in a press release.

5 total3 operating2 just announced

Most-frequent partners

  1. 1AWS1× joint976 total
  2. 2Google1× joint117 total
  3. 3Microsoft1× joint
  4. 4NVIDIA1× joint1112 total
  5. 5Thinking Machines Lab1× joint

Relationships

Current leadership (5)

Founders (2)

See all founders across the registry →

Safety record

No incidents on record for Crusoe.

Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.

Full safety record: incidents, sourcing, and exposure data →

Crusoe on the data-center map

Every verified data center Crusoe operates that has a mapped coordinate (20 total). Filled circles are Tier-2 facilities and Tier-1 campuses under this operator; click any pin to open its record.

Crusoe data centers (20)

AI data centers Crusoe operates or is a party to, from the DEPLOY data center registry.

Recent coverage

Crusoe in third-party press

Appears in DEPLOY reports