Data center campus
Project Kilby (Chevron / Microsoft)
Project Kilby is an announced AI data center campus. 2.70 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Announced · greenfield · ERCOT · Pecos, Texas, United States
Capacity: announced vs energized
Announced
2.70 GW
reported
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Announced-to-energized gap: 2.70 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 2.70 GW | 2026-06-22 | reported | earnings call |
The deal
- developer
- Chevron · Builds and operates power plant
- offtaker
- Microsoft · 20-year power agreement
- chip supplier
- GE Vernova · Gas turbine supplier
Power
- Power source
- behind the meter gas
- Grid operator
- ERCOT
- Interconnection
Kilby co-located gas plant, 2.70 GW gas, Announced. GE Vernova + Solar Turbines; FID pending
Sources
- Chevron Signs 20-Year Power Agreement with Microsoft for West Texas Data Center
- Chevron to fuel massive Microsoft data center in Texas using natural gas
665b9f79-cb24-42f4-ade4-af461047459d · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.