Data center campus
Core Scientific / CoreWeave Denton HPC Campus
Former Core Scientific bitcoin site being converted/expanded to host CoreWeave GPU HPC under a 12-year lease (two five-year renewal options). Feb 2025 amendment added ~70 MW, bringing full critical IT load at Denton to roughly 260 MW; part
Under construction · Brownfield · ERCOT · Denton, Texas, United States
Capacity: announced vs energized
Announced
not recorded
Contracted
0.26 GW
verified
Under construction
not recorded
Energized
not recorded
| Source | ||||
|---|---|---|---|---|
| Contracted | 0.26 GW | 2025-02-26 | verified | sec filing |
The deal
- operator
- Core Scientific, Inc. · Ticker CORZ; host/landlord
- offtaker
- CoreWeave, Inc. · Ticker CRWV; 12-year HPC hosting lease, $1.2B expansion value
- utility
- Denton Municipal Electric · ERCOT
Power
- Power source
- grid
- Grid operator
- ERCOT
- Interconnection
Denton Municipal Electric grid supply, 0.26 GW grid interconnect, Under construction. Denton Lease Amendment for additional land and access to power
Sources
- Core Scientific, Inc. Form 10-K FY2024
- Core Scientific and CoreWeave Announce $1.2 Billion Expansion at Denton, TX Site
de9b52ad-720d-4e9d-bbee-7fdc72adc5e2 · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.