Core Scientific / CoreWeave Denton HPC Campus

Former Core Scientific bitcoin site being converted/expanded to host CoreWeave GPU HPC under a 12-year lease (two five-year renewal options). Feb 2025 amendment added ~70 MW, bringing full critical IT load at Denton to roughly 260 MW; part

Under construction · Brownfield · ERCOT · Denton, Texas, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
0.26 GW
verified
Under construction
not recorded
Energized
not recorded
Core Scientific / CoreWeave Denton HPC Campus capacity claims
Source
Contracted0.26 GW2025-02-26verifiedsec filing

The deal

operator
Core Scientific, Inc. · Ticker CORZ; host/landlord
offtaker
CoreWeave, Inc. · Ticker CRWV; 12-year HPC hosting lease, $1.2B expansion value
utility
Denton Municipal Electric · ERCOT

Power

Power source
grid
Grid operator
ERCOT
Interconnection

Denton Municipal Electric grid supply, 0.26 GW grid interconnect, Under construction. Denton Lease Amendment for additional land and access to power

Sources

de9b52ad-720d-4e9d-bbee-7fdc72adc5e2 · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.