Data center campus

Alpha Digital Campus (LandBridge / PowerBridge)

Alpha Digital Campus is an announced AI data center campus. 2 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Announced · Private land · ERCOT · Pecos, Texas, United States


Capacity: announced vs energized

Announced
2 GW
reported
Contracted
not recorded
Under construction
not recorded
Energized
not recorded

Announced-to-energized gap: 2 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Alpha Digital Campus (LandBridge / PowerBridge) capacity claims
Source
Announced2 GW2026-04-02reportedutility filing

The deal

developer
PowerBridge · Power + data-center developer
financier
LandBridge Company (NYSE: LB) · Surface-land owner/lessor

Power

Power source
behind the meter gas
Grid operator
ERCOT
Interconnection

Alpha Digital co-located generation, 2 GW gas, Announced. Co-located gas generation near Waha hub

Sources

88a8d36e-a461-4d72-be47-0deb84cdb9d9 · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.