Data center campus
Riot Corsicana Campus
Riot Corsicana Campus is a tracked AI data center campus in Texas, Navarro County. Riot Platforms signed a 15-year triple-net powered land lease for its entire Corsicana campus. Riot says the lease covers 910 MW of critical IT capacity, with approximately $28 billion of total contract value. Riot's pre
Announced · Riot Platforms · Corsicana, Navarro County, Texas, United States
Capacity: announced vs energized
Expected online: September 2027 (first phase). 10 months away..
| Source | ||||
|---|---|---|---|---|
| Contracted | 0.91 GW | 2026-11-04 | claimed | press release |
Key facts
On the data center map
Every tracked data center is on this map, centered on Riot Corsicana Campus. Pan or zoom out to see how close rivals are building.
- Grid
- live in ~13 months
- Tenant
- Anthropic
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterNavarro County(7)·Texas(611)
The deal
- developer
- Riot Platforms
- tenant
- Anthropic
Power
- Interconnection
County water status: Severe drought (D2) in Navarro County, week of 2026-11-17 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Riot Corsicana Campus is in Texas, Navarro County. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document. 4 permits on file with TCEQ: 4 stormwater authorizations.
Timeline
- Nov 2026energization date changedintake proposal 9cb59f75-0cda-400b-88ff-66960804166b
- Nov 2026Current: Announced
Sources
- Riot Platforms Reports Third Quarter 2026 Financial Results and Strategic Highlights · Riot Platforms
- Riot names Anthropic as tenant of Texas lease · Bitcoin Magazine
- Riot Platforms signs a 15 year data center lease in Texas · W.Media
b06c9ed6-a2b0-47f6-8e0b-4f813716de91 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Riot Corsicana Campus?
Who is building Riot Corsicana Campus?
Is Riot Corsicana Campus operating yet?
How verified is the data on Riot Corsicana Campus?
Deploy Watch
Track Riot Corsicana Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Riot Corsicana Campus: AI data center campus record. Retrieved November 20, 2026, from https://registry.deploy.report/datacenters/riot-corsicana-campus
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/riot-corsicana-campus.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/riot-corsicana-campus
- Data documentation: /data
- Query this programmatically: Deploy MCP