Data center campus
Sandow Lakes Power / Data Center Campus
Sandow Lakes Power / Data Center Campus is an AI data center campus developed by Sandow Lakes Energy Company in Texas, Blue. 1.20 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Under construction · Sandow Lakes Energy Company · Former industrial site · ERCOT · Blue, Texas, United States
Capacity: announced vs energized
Announced-to-energized gap: 1.20 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2028. 27 months away. Claimed by Gemma Power Systems (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 1.20 GW | 2025-10-01 | reported | permit |
Key facts
Lifecycle
Announced
Energized
Sandow Lakes Energy Company
Developer
Location
Grid
Announced-to-energized gap
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- 1.2 GW gas plant EPC (primary Argan / BusinessWire)
- Argan, Inc. announced via BusinessWire (Feb 6 2025) that subsidiary Gemma Power Systems executed an EPC contract for a 1.2 GW ultra-efficient natural gas-fired power plant in Lee County, Texas, developed by Sandow Lakes Energy Company, with completion targeted for 2028 (Argan / BusinessWire, Feb 6 2025)
- Notice to proceed / Siemens turbines (reported EnergyTech)
- EnergyTech reported (Apr 9 2025) that Gemma received notice to proceed on the Sandow Lakes EPC, describing a combined-cycle station with two Siemens Energy SGT6-9000HL natural gas turbines (hydrogen-capable pathway), a Matterhorn pipeline tap, and Lee County / Giddings EDC interest in attracting data centers. Named data-center tenants were not disclosed (EnergyTech, Apr 9 2025)
- NTP backlog confirmation (primary Argan / BusinessWire)
- A follow-on Argan BusinessWire release (Apr 7 2025) confirmed Gemma received notice to proceed on the same 1.2 GW Lee County EPC with Sandow Lakes Energy Company, adding the project to Gemma's backlog. Treat plant MW as the generation project size; on-site IT load for any future data halls remains tenant- and phase-dependent (Argan / BusinessWire, Apr 7 2025)
On the data center map
Every tracked data center is on this map, centered on Sandow Lakes Power / Data Center Campus. Pan or zoom out to see how close rivals are building.
In clusterTexas(606)
The deal
- developer
- Sandow Lakes Energy Company · Owns power plant via subsidiary
- operator
- Gemma Power Systems (Argan Inc.) · EPC contractor
- construction
- Siemens Energy · Turbine supplier: two SGT6-9000HL hydrogen-capable natural-gas turbines.
Power
- Power source
- behind the meter gas
- Grid operator
- ERCOT
- Interconnection
Sandow Lakes Power Plant, 1.20 GW gas, Under construction. TCEQ air permit issued Oct 2025; Gemma/Argan NTP
The Texas (ERCOT) grid demand right now: 65.1 GW (EIA-930, 2026-10-02 01:00). Sandow Lakes Power / Data Center Campus's announced 1.20 GW would be 1.8% of the grid's current load.
County water status: Exceptional drought (D4) in Bryan County, week of 2026-09-29 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Sandow Lakes Power / Data Center Campus sits on former industrial site in Texas, Blue. It connects to the ERCOT grid, draws on behind the meter gas power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Aug 2026party addedconstruction: e7d59434-cc22-4392-bfb2-817f64b171b5
- Oct 2026Current: Under construction
Sources
- Rural Texas County Welcoming 1.2-GW Gas-Fired Project to Seek Data Center Development
- Huge Texas data centers will get their own gas power plants
- Argan, Inc.'s Gemma Power Systems Executes EPC Contract for a 1.2 GW Power Project in Texas
- Argan, Inc.'s Gemma Power Systems Receives Notice to Proceed on EPC Contract for a 1.2 GW Power Project in Texas
b26697a8-cfa3-4c44-9aa4-b37e912d9536 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Sandow Lakes Power / Data Center Campus?
How much power will Sandow Lakes Power / Data Center Campus use?
Who is building Sandow Lakes Power / Data Center Campus?
Is Sandow Lakes Power / Data Center Campus operating yet?
How verified is the data on Sandow Lakes Power / Data Center Campus?
Deploy Watch
Track Sandow Lakes Power / Data Center Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Sandow Lakes Power / Data Center Campus: AI data center campus record. Retrieved October 2, 2026, from https://registry.deploy.report/datacenters/sandow-lakes-lee-county-texas
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/sandow-lakes-lee-county-texas.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/sandow-lakes-lee-county-texas
- Data documentation: /data
- Query this programmatically: Deploy MCP